| Location: | New York |
|---|---|
| Posted: | Oct 28, 2025 |
| Due: | Dec 18, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: On October 24, 2025, PSEG Long Island, as agent of and acting on behalf of LIPA, issued a request for proposals, the 2025 ISO-NE Capacity Request for Proposals, to procure up to 345 MW of Capacity from one or more generating facilities located in the New England Control Area for the NYISO Capability Years 2027 – 2028, 2028 – 2029, 2029 – 2030, 2030 - 2031, and 2031 - 2032, which are eligible to qualify as Locational Installed Capacity for Long Island (Load Zone K) under the applicable NYISO Rules. Each Proposal must offer a minimum of 25 MW from a single Project. Any questions or needed clarifications concerning this RFP should be sent to: PSEGLI-2025-ISO-NECapacityRFP@psegliny.com .
RFP Target Dates
Contract Term: 5 Location: Ad Type: General
|
Release of RFP |

With GovernmentContracts, you can:
...lowered height. 3,300 Lbs load capacity. Adjustable fork width 5.5 inch - 27 ...
DEPT OF DEFENSE
Bid Due: 6/08/2026
...and practices; HVAC and lighting technologies, automation technologies enabling load flexibility and smarter...
New York State Energy Research and Development Authority
Bid Due: 1/22/2030
...., weatherization, load reduction, etc.) that maximize bill savings, improve comfort, and result ...
The New York State Contract Reporter
Bid Due: 12/30/2027
...: Space should have a load bearing capacity of no less than 11,500 ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/18/2026