ADDENDUM No. 1
TO THE
REQUEST FOR QUALIFICATIONS
For
CONULTING SERVICES
RFQ NO. PW-26-01 WATER SYSTEM MASTER PLAN
THIS ADDENDUM IS HEREBY MADE A PART OF THE REQUEST FOR QUALIFICATIONS
DOCUMENTS DATED NOVEMBER 7, 2025, TO THE SAME EXTENT AS THOUGH IT WERE
ORIGINALLY INCLUDED THEREIN.
ISSUED THIS 15th DAY OF DECEMBER, 2025.
CITY OF ROSEBURG
PUBLIC WORKS DEPARTMENT
900 SE DOUGLAS AVENUE
ROSEBURG, OREGON 97470
(541) 492-6730
Page 1 of 2
Project# PW-26-01
Addendum No. 1
This addendum forms a part of the Request for Qualifications (RFQ) and modifies the
original Documents as noted below. Acknowledge receipt of this addendum in the space
provided on the submittal form. Failure to do so may subject the Bidder to
disqualification.
Clarifying Information:
Question #1:
Under the Water System Mast Plan Format, within exhibit “C”,
section A.7.c. states “perform visual inspection of interior and
exterior of the City’s thirteen (13) reservoirs and provide specific
recommendations with planning level estimates regarding recoating,
cathodic protection, and miscellaneous improvements.
Is it the City’s intent to have these inspections done as part of the
Water Master Plan evaluation?
Response:
Yes, we want the tanks to be inspected externally, and internally
with divers, as part of the existing infrastructure evaluation.
Question #2:
Response:
Can the City provide GIS files for the existing water system?
The City of Roseburg will provide the active GIS files for the existing
water system to the selected consultant when they begin work on
the planning document. For this SOQ the existing system can be
closely summarized by referring to the existing water master plan
(MSA,2010). Specific improvements that have happened since that
plan can be provided if requested.
END OF ADDENDUM NO. 1
Jesten Brenner, P.E.
City of Roseburg Public Works Department
Issued December 15, 2025
Page 2 of 2