| Location: | Florida |
|---|---|
| Posted: | Jun 11, 2026 |
| Due: | Jun 30, 2026 |
| Agency: | JEA |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The purpose of this solicitation for RiverTown New Storage and Pumping System – Phase II is to evaluate and select a vendor to provide all labor, materials, equipment, and services necessary to complete the remaining construction activities associated with the reclaimed water storage and pumping facility, as described in this Solicitation, and to determine the best method for JEA to procure the Work with regards to pricing, quality, design, and workmanship.
The Work includes, but is not limited to, construction of the re-pump station, roadway and pavement installation, yard and reclaimed water piping, fencing and gate systems, site grading and landscaping, stormwater improvements, installation of a precast electrical building with HVAC, electrical and instrumentation systems, SCADA infrastructure, concrete work, startup, testing, commissioning, and all associated appurtenances required for a complete and operational facility. The project will be constructed under the Design-Bid-Build delivery method and will require coordination with the previously awarded Phase I contractor responsible for construction of the ground storage tanks and associated initial site work.
USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:
https://dewdrops.zycus.com/zsp/guest/genericRegister/JEA074/iSource/1054312/
Mandatory Pre-Response Meeting: May 28, 2026, at 11:00 AM
Response Due Date: June 23, 2026
Response Due Date: June 30, 2026

With GovernmentContracts, you can:
...Description: Optimization and Improvements Design-Build Department: Water Utilities Buyer: Krystin...: Design/Build Closing Date ...
Palm Beach County
Bid Due: 1/23/2030
...Description: Optimization and Improvements Design-Build Department: Water Utilities Buyer: Krystin...: Design/Build Closing Date ...
Palm Beach County
Bid Due: 1/06/2030
...Description: Optimization and Improvements Design-Build Department: Facilities Dev & Ops Buyer...
Palm Beach County
Bid Due: 1/06/2030
...Finegan Title Design-Build Services for OUC District Cooling Secondary Contact Number PR9347 Tertiary... ...
Orlando Utilities Commission
Bid Due: 8/14/2026