| Location: | Illinois |
|---|---|
| Posted: | Jan 27, 2025 |
| Due: | Feb 17, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912QR25BA005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap.
| Jan 15, 2025 | [Solicitation (Original)] EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL |
| Jan 16, 2025 | [Solicitation (Updated)] EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL |
| Feb 5, 2025 | [Solicitation (Updated)] EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL |
| Feb 14, 2025 | [Solicitation (Updated)] EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL |
| Feb 19, 2025 | [Solicitation (Updated)] EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL |

With GovernmentContracts, you can:
...The City of Mount Vernon, Illinois, is seeking proposals for the design, engineering... ...
City of Mount Vernon
Bid Due: 7/01/2026