| Location: | California |
|---|---|
| Posted: | Jul 22, 2025 |
| Due: | Jul 22, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912PL25BA008 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Be advised that the Bid Abstract has been posted and is available to download on 7.22.2025 at 1600. PIEE update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. PIEE Update 0003 is issued to transmit the SF-30 (7 pages) for Amendment 0002 of the IFB W912PL25BA008. This is to extend the bid opening date and remove all references of bid submission through DoD Safe. Bids may only be submitted through PIEE. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA008. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.
| Jun 18, 2025 | [Solicitation (Original)] Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus |
| Jun 25, 2025 | [Solicitation (Updated)] Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus |
| Jul 2, 2025 | [Solicitation (Updated)] Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus |
| Jul 18, 2025 | [Solicitation (Updated)] Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus |

With GovernmentContracts, you can:
Follow Install Water Softener and Hot Water Heaters at FCI Mendota Active Contract
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
Follow Repair ADM Baker Pool Complex Active Contract Opportunity Notice ID NAVMWR-26-R-0029 Related
DEPT OF DEFENSE
Bid Due: 6/05/2026
Project ID: MHC/039 Title: ATLAS (Access, Treatment, Linkage, and Stabilization): Integrated Children's Specialty
Sacramento County
Bid Due: 6/10/2026
Cold plane AC, place HMA, repair culvert and drainage system.Details Event ID 04-3X6904
State Government of California
Bid Due: 6/04/2026