| Location: | New Jersey |
|---|---|
| Posted: | May 8, 2025 |
| Due: | May 8, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DS25BA005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Pre-Solicitation Notice for Maintenance Dredging of Newark Bay, New Jersey, Federal Navigation Project
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of portions of the Newark Bay, New Jersey, Federal Navigation Project. The dredged material would be processed and subsequently transported to and placed at a contractor furnished, State permitted upland placement site(s). The proposed maintenance dredging would remove approximately 386,000 cubic yards (a minimum of approximately 237,000 cubic yards as basic work, and the remaining as optional work) of selected critical shoals from the Main and South Elizabeth Channels of Newark Bay. Dredging in these channels would be required to depths of -50 feet, -45 feet, and/or -40 feet Mean Lower Low Water (MLLW) plus 1-foot allowable overdepth. The dredged material is expected to consist primarily of silt and clay.
Due to restrictions found in the New Jersey Department of Environmental Protection Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical dredge with a closed clamshell environmental bucket. Additionally, multiple barges and tugboats will be needed to perform the work during the dredging, dewatering and unloading operations. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located. All necessary permits required for the dredged material placement will be provided by the contractor to the government.
The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government. Bidders should consult the specifications for all submittal requirements.
Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and maintain an
integrated production rate of at least 2,500 cubic yards per calendar day for the dredging, transportation, transfer, dewatering, processing, and final placement of the material. The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.
Plans and specifications for the subject project are expected to be available in May 2025, with bid opening in June 2025. It is the intention of the government to award in August 2025 and the proposed work is anticipated to take place between August 2025 and February 2026. The work is estimated to cost between $25,000,000 and $100,000,000.
Liquidated damages of $2,843.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.
This is an unrestricted Procurement.
No Bids are required at this time. This is just a Pre-Solicitation Notice.
| Apr 17, 2025 | [Presolicitation (Original)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |
| May 8, 2025 | [Solicitation (Original)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |
| May 15, 2025 | [Solicitation (Updated)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |
| May 19, 2025 | [Solicitation (Updated)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |
| May 21, 2025 | [Solicitation (Updated)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |
| Jun 3, 2025 | [Solicitation (Updated)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |
| Jun 11, 2025 | [Solicitation (Updated)] Maintenance Dredging of Newark Bay, NJ – -50ft., -45ft., -40ft., and -35ft. Reaches |

With GovernmentContracts, you can:
Project ID: RFP 14-27 Title: Services for the Deaf and Hard of Hearing
Passaic Public Schools
Bid Due: 6/12/2026
Bid Title: 2026 Tree Irrigation Services Rebid Category: Division of Engineering Status: Open
Ridgewood village
Bid Due: 6/08/2026
Hansen RAD Automatic Door Maintenance & Repair 2026-28
Perth Amboy Housing Authority
Bid Due: 6/16/2026