Request For Quote
Quote: 013026CM01
The South Carolina Department of Behavioral Health and Developmental
Disabilities-Office of Intellectual and Developmental Disabilities is interested in
obtaining a price quote on the services/items listed below. If you would like to
provide a quote, please return this form with your quote information to
Procurement@ddsn.sc.gov NO LATER THAN 12:00PM ON MONDAY FEBRUARY
23rd , 2026. If you have any questions, please call 803-898-9750.
Price Schedule
The Office of Intellectual and Developmental Disabilities is interested in obtaining
the following items/services at SCOIDD WHITTEN CENTER with the minimum
specifications below.
Date of Submission:___________________
Line Description
Item
1 Remove old HVAC split system to
include refrigerant recovery
1 Provide and install 15 ton Trane
(or approved equivalent) split
system HVAC unit w/Hail guards
2 Provide and install Siemens
RDY200BN Thermostat
Total -----------------------------
QTY
Unit
1
ea
1
ea
1
ea
-------------- -----------
Price
$
$
$
$
**Please review Statement of Work for more details on this project**
Vendor Number:______________________________
Vendor Name: ______________________________
Authorized Signature: __________________________
Contact Name: _______________________________
Telephone: __________________________________
Email Address: _______________________________
*Must be a Registered South Carolina Vendor to provide quote*
STATEMENT OF WORK
1. Background
The South Carolina Department of Behavioral Health and Developmental Disabilities, Office of Intellectual and
Developmental Disabilities provide services for individuals with intellectual disabilities, autism, head and spinal
cord injury and conditions related to each of these four disabilities. Our mission is to assist people with disabilities
and their families through choice in meeting needs, pursue possibilities and achieving life goals; and minimize
the occurrence and reduce the severity of disabilities through prevention. The installation of a new HVAC unit at
our Whitten Center’s Kitchen is necessary as the current HVAC system is older and it is more cost-effective to
replace, rather than have multiple repairs for the aging unit.
2. Objectives
The goal of this contract is to install a new 15 ton Trane split system heat pump (or approved equivalent) at the
kitchen on Whitten Center Campus.
Estimated Project Commencement Date:
March 9th , 2026
Estimated Project Completion Date:
March 30th , 2026
3. Scope
The Contractor must provide all parts and labor to install a 15 ton Trane split system heat pump (or approved
equivalent) at the Kitchen on the Whitten Center campus. Additional specifications below:
The Trane split system HVAC unit for the Whitten Kitchen needs replaced.
We would like to replace with Trane (Or approved equivalent) unit:
• TWA180K3DA HEAT PUMP
• TWE180K3BAA Air Handler
• 20 kW electric heat
• Hail Guards
Also provide and install:
Siemens RDY2000BN thermostat
This unit should have the R-454B refrigerant. Remove and dispose of old equipment. Flush and reuse the existing
line set. Install new equipment. Tie into the existing duct work and seal connections. All work, wiring, and duct is
to be to code. Make sure existing sensors, BAS, and Fire/smoke, are reinstalled and operating correctly. Replace
the disconnect on the condenser. Replace the disconnect on the air handler at Randy Flack's discretion.
Bring new unit online and ensure proper operation.
All warranty information to be provided at project completion.
Quote to include all labor, materials and equipment necessary to complete the job.
4. Location of Work
• Work will be performed at the SCOIDD Whitten Center, Kitchen, located at 28373 US-76, Clinton, SC
29325.
5. Site Visit By Appointment
Do not show up to the site visit without notifying SCOIDD. If no one requests to attend the site visit, the site
visit for the scheduled day will be cancelled. You must contact SCOIDD at least one (1) business day before the
scheduled site visit notifying them of your intent to attend.
POC for Scheduling Visits: Randy Flack
O: 864-938-3548
M: 864-607-0124
Scheduled date for site visit at Whitten Center: Tuesday February 17th, 2026 at 10:00am.
6. Requirements
Contractor’s Requirements:
• Site Visit: All interested contractors should perform a site visit at the centers to ensure they understand the
full scope of the work and site conditions. The site visit will afford the contractor sufficient time to make
certain that they can determine the exact extent of work required.
• Contractor shall work with region point of contact to coordinate work schedules and address any questions
regarding standards in this statement of work.
• The contractor shall remove old system to include refrigerant recovery and install a 15 ton Trane split
system heat pump as specified in this scope. Notifying the region point of contact of process and timeline
of installation.
• Vendor Registration: You must have a state vendor number to be eligible to submit an offer. To obtain a
state vendor number, visit www.procurement.sc.gov and select Doing Business with Us. Then select New
Vendor Registration. (To determine if your business is already registered, go to "Vendor Search"). Upon
registration, you will be assigned a state vendor number. Vendors must keep their vendor information
current. If you are already registered and know your User ID and Password, you can update your
information by selecting Update Vendor Registration. If you need to update information but do not have
your User ID/Password, you must complete a new vendor registration and On Step 9 – Messages to
Administration indicate “Update vendor number” with your existing 10-digit vendor number. (Please note
that vendor registration does not substitute for any obligation to register with the S.C. Secretary of State or
S.C. Department of Revenue. You can register with the agencies at South Carolina Business One Stop,
http://scbos.sc.gov
SCOIDD Requirements:
• Upon bid submittal deadline, SCOIDD will determine the awarded Contractor based upon the lowest quote
of a responsible and responsive bidder. No bids will be accepted after the bid submittal deadline.
• Awarded Contractor will be provided a purchase order as a notice to proceed with establishing the work
schedule.
• Provide Contractor with point of contact in which to solidify work schedule, identify any conflicts in the
work schedule, and to address any questions regarding standards notated in this statement of work.
• Point of contact to direct Contractor on the work site as needed and to ensure that the Contractor
requirements are met to the standards noted in this statement of work.
• Payment: Payment for this project will be issued after the project is completed to the standards noted in
this statement of work and an invoice is provided to SCOIDD. Payment will be issued by the payment
method in your vendor profile in the South Carolina business system SCEIS.
6.1. Tasks
Contractor Tasks:
• Work Hours: All work shall be performed during the normal working hours (8:00 a.m. to 4:30 p.m.),
Monday through Friday
• The Contractor shall coordinate with the region’s point of contact for the purpose of establishing a work
schedule.
• Damage to Government property: Contractors shall be responsible for replacement of any facility structure,
to include: grass, turf, curb, road pavement, valve boxes, control markers, sprinkler heads, which is
chipped, marred, damaged and/or ruined at the fault of the Contractor. The Contractor shall bear all costs
associated with replacement and reinstallation.
• Contractors shall be responsible for cleaning any facility structure that are soiled or stained as a result of
contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures and
grounds at the end of each workday. No chemicals are to be used at anytime on Government property. The
Contractor shall bear all costs associated with washing and cleaning. Any such washing/cleaning shall be
brought to the immediate attention of the region’s point of contact prior to washing/cleaning.
• At the end of each day the Contractor shall remove all debris from the worksite.
• Contractor personnel must exercise and exhibit absolute decorum, composure, and stability at all times.
• The contractor is responsible for supplying all equipment, personnel, tools, supplies and materials to
perform these services.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.