| Location: | California |
|---|---|
| Posted: | Oct 18, 2024 |
| Due: | Nov 20, 2024 |
| Agency: | City of Thousand Oaks |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Improvements at Pederson and Willow Lane Pump Stations
Addenda: 0
Release Date: 10/18/2024
Due Date: 11/20/2024
The proposed improvements at the pump stations will address the following scope of work:
The City’s Public Works Department manages the City’s water storage and distribution facilities consisting of 11 Calleguas turnouts (connections to the Calleguas Municipal Water District Supply), four hydropneumatic pump stations, 16 pump stations, 16 reservoirs, and two booster stations. Many of these sites need certain improvements to address enhanced wildfire resiliency, site drainage, accidental tank overflow containment, pump, and electrical equipment enclosures, fencing, and the addition of emergency generators and disinfection boosting stations.
A comprehensive citywide Water Storage Optimization Study, addressing water quality improvements within the City's water distribution network as a result of reduced demand and longer water age in the reservoirs after the 2022 drought. The study identified Pederson and Willow Lane Reservoirs as high-priority sites for the installation of a permanent disinfection boosting system to assist with water quality.

With GovernmentContracts, you can:
...Channel Water Quality Improvements, Project No. US25011 in strict accordance with the Request... ...
City of Stockton
Bid Due: 7/09/2026
...TOS No. 207 - La Brea Avenue Street Improvements - Environmental Documentation and ...
City of Los Angeles
Bid Due: 6/11/2026
...Follow Strategic Quality Support System (SQSS) - Ft Yuma Health Care Center Active ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/18/2026
...be responsible for participating in continuous quality improvement (CQI) activities, collecting and reporting..., ...
Marin County
Bid Due: 7/10/2026