| Location: | South Carolina |
|---|---|
| Posted: | Dec 18, 2025 |
| Due: | Jan 20, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project consists of the removal and disposal of existing CMP riser, clearing and grubbing, erosion, sediment and pollution control, dewatering, and placement of new concrete riser structure and metal catwalk.
Please refer to bid documents for specifications

With GovernmentContracts, you can:
...* Installation of erosion and sedimentation control facilities A non-mandatory pre-bid conference will ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...and erosion control measures. Pre-Bid Information: Optional Pre-Bid Meeting held at Lower Reedy ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...and wood habitat and stabilization structures, erosion and sediment control measures, and establishment...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control..., ...
City of Charleston
Bid Due: 8/07/2026