| Location: | Georgia |
|---|---|
| Posted: | May 14, 2025 |
| Due: | Jun 12, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66956-NONST-2025-000000043 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66956-NONST-2025-000000043 | ITB 2025-008 RICHARDSON STREET CONSTRUCTION | Tucker, City Of |
May 14, 2025 @ 03:11 PM
|
Jun 12, 2025 @ 01:00 PM
|
Start Date: May 14, 2025 @ 03:11 PM ET
End Date:
Jun 12, 2025 @ 01:00 PM ET
The work consists of furnishing and installing all materials, labor, tools, equipment, and related services required for a complete project in accordance with the Contract Documents. The project begins at the existing intersection of Richardson Street and Stone Mill Way and terminates at East Ponce De Leon Avenue consisting of traffic control, erosion control, clearing and grading, approximately 1.55 acres of demolition of existing conditions, and construction and / or installation of approximately 1,424 linear feet of roadway, 1,546 linear feet of six-foot wide ADA compliant sidewalk, approximately 1,300 linear feet of stormwater infrastructure, and 5000 linear feet of conduit installation.
| Code | Description |
| 91371 | Maintenance and Repair, Highway and Roads, Including Removal of Asphalt, Concrete, Bitumens, etc. |
| 91381 | Maintenance and Repair, Sewer and Storm Drain, Including Removal |
| 98814 | Erosion Control Services |
| 91396 | Paving and Resurfacing, Streets, Major and Residential |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 91345 | Construction, Sewer and Storm Drain |
| 91327 | Construction, Highway and Road |
Procurement Officer
procurement@tuckerga.gov
678-597-9040

With GovernmentContracts, you can:
...Project: Sewer Flow Monitoring Services Ref. #: 27-19-3320 Type: RFP Status: Open Open ...
Forsyth County
Bid Due: 10/15/2026
...27-050 Red Hot Sewer Solvent Available Date: 9/15/2026 Due Date: 10/5/2026 no later ...
https://www.augustaga.gov/
Bid Due: 10/05/2026
...Curtis Pkwy Water and Sewer Relocation Calhoun, City Of Sep 21, 2026 @ ...
State Government of Georgia
Bid Due: 10/22/2026
...Downtown Franklin Water and Sewer Project Heard County Water Authority Aug 17, 2026 ...
State Government of Georgia
Bid Due: 10/09/2026