| Location: | Colorado |
|---|---|
| Posted: | Apr 10, 2026 |
| Due: | May 6, 2026 |
| Agency: | Grand County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Title: |
2026 Asphalt Bid
|
| Category: | Road Work |
| Status: | Open |
|
| Scope of work area. 3" / 5+" BASE Given % of medium to high severity distresses and lack of crown in some INDICATES ASPHALT THICKNESS, BASE THICKNESS & APPROXIMATE areas, considerations should be made for a minimum 4" (full depth) mill and LOCATION. replace. Following milling, subgrade should be compacted with a smooth drum/pneumatic roller, proof rolled, and paved. | EXAMPLE DISTRESS / REHAB. OPTIONS - FAIRWAYS @ POLE CREEK (SOUTH) JOB NO.: 23-3658 FIGURE: 6 CADFILE NAME: 3658SITE.DWG |
Scope of work area. 3" / 5+" BASE
Given % of medium to high severity distresses and lack of crown in some
INDICATES ASPHALT THICKNESS, BASE THICKNESS & APPROXIMATE
areas, considerations should be made for a minimum 4" (full depth) mill and
LOCATION. EXAMPLE DISTRESS / REHAB. OPTIONS - FAIRWAYS @
replace. Following milling, subgrade should be compacted with a smooth
POLE CREEK (SOUTH)
drum/pneumatic roller, proof rolled, and paved.
JOB NO.: 23-3658 FIGURE: 6
CADFILE NAME: 3658SITE.DWG

With GovernmentContracts, you can:
...Project ID: 26-009 (DT2401) Title: Construction of Sun Mountain Boulevard Addenda: 0 Release ...
City of pueblo
Bid Due: 10/21/2026
...Project ID: 26-038 (PL2201); CDOT M086-089 (25192) Title: Construction of Wildhorse Trail... (Westside ...
City of pueblo
Bid Due: 9/30/2026
...General Civil Construction and Pipeline Maintenance Services Solicitation Document Docusign Envelope... CIVIL CONSTRUCTION ...
City of Thornton
Bid Due: 10/14/2026
...General Civil Construction and Pipeline Maintenance Services Solicitation Document Docusign Envelope... CIVIL CONSTRUCTION ...
City of Thornton
Bid Due: 10/14/2026