Reconstruct Airport Perimeter Fence Phase 2-PIE

Location: Florida
Posted: Jul 12, 2026
Due: Aug 6, 2026
Agency: Pinellas County
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 26-0618-ITB-C
Publication URL: To access bid details, please log in.


Project ID: 26-0618-ITB-C

Title: Reconstruct Airport Perimeter Fence Phase 2-PIE

Addenda: 0

Release Date: 7/10/2026

Due Date: 8/6/2026

Follow
Reconstruct Airport Perimeter Fence Phase 2-PIE
Invitation to Bid - Construction (ITB-C)
ST. PETE- CLEARWATER INTERNATIONAL AIRPORT
Project ID: 26-0618-ITB-C
Release Date: Friday, July 10, 2026
ยท Due Date: Thursday, August 6, 2026 3:00pm
Posted Friday, July 10, 2026 10:33am
All dates & times in Eastern Time
Draft Response Events RSVP No Bid24 days, 17 hours, 43 minutes


Post Information

Posted At:Fri, Jul 10, 2026 10:33 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The St. Pete-Clearwater International Airport intends to enhance the safety and security of the Air Operations Area (AOA) by replacing vulnerable portions of existing fencing and gates with a more robust fencing/gate system to improve the prevention of access by people and wildlife. In various locations, existing fencing and gates will be removed and replaced with 8-foot tall prefabricated, non-scalable fencing topped with razor wire and wildlife deterrent skirt at the base. This fencing will match the existing fencing installed in the Fencing Phase 1 project that was completed in 2025.



Background

The St. Pete-Clearwater International Airport has existing fencing and gates surrounding the AOA that have higher risk for vulnerabilities, including areas of older deteriorating fencing and gates in need of replacement. In various locations, existing fencing and gates will be removed and replaced with 8-foot tall prefabricated, non-scalable fencing topped with razor wire and wildlife deterrent skirt at the base. This fencing will match the existing fencing installed in the Fencing Phase 1 project that was completed in 2025.



Timeline

Issue Date:
July 10, 2026
Site Visit / Pre-Conference Information (Non-Mandatory):
July 23, 2026, 10:00am
14700 Terminal Blvd., 2nd Floor Conference Room, Clearwater, FL 33762
Step 1 Question Qualification Submission Deadline:
July 30, 2026, 3:00pm
Step 1 Bid Qualification Submission Deadline:
August 6, 2026, 3:00pm
Step 2 Bid Submission Deadline:
August 20, 2026, 3:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Security Services 68002 Access Control Systems and Security Systems 91319 Construction, Curb and ...

Palm Beach County

Bid Due: 10/06/2026

...(Security Fence). Bid Group #3 = 07.02- Roofing; 07.04- Metal Panels; 08.03- Non-Security ...

State Government of Florida

Bid Due: 10/31/2026

.... Improvements (Security Fence). Bid Group #3 = 07.02- Roofing; 07.04- Metal Panels; ...

State Government of Florida

Bid Due: 10/30/2026

...to design, furnish and install a security fence and access gates at the ...

City of Punta Gorda

Bid Due: 9/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.