| Location: | California |
|---|---|
| Posted: | Jul 27, 2025 |
| Due: | Aug 15, 2025 |
| Agency: | City of Palo Alto |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Hamilton Avenue Capacity Upgrades (SD-25000) Project
Addenda: 0
Release Date: 7/25/2025
Due Date: 8/15/2025
The Hamilton Avenue Capacity Upgrades Project proposes to upsize the storm drain line on Hamilton Avenue from Center Drive to Rhodes Drive. The existing pipe on Hamilton Avenue vary in diameter from 12-inch to 21-inch pipe. This project proposes to replace the existing system, pipes varying from 12-inch to 21-inch, with a dual storm drain system of 24-inch and 36-inch pipe, and 48-inch pipe throughout Hamilton Avenue. A new segment of 36-inch storm drain pipe is proposed on Center Drive, starting at Hamilton Avenue going towards Dana Avenue. The bid alternate scope of work proposes to upsize the existing 12-inch line to 36-inch on Alester Avenue. Storm drain system improvements include installation of catch basins, manholes, wye tee, gate valves, junction boxes, modifying existing junction box, trench restoration, and CCTV work. Contractor is responsible for preparing plans (traffic control, dewatering, logistics). Work includes, but is not limited to signing, striping, tree trimming, and concrete work.
The Engineer’s Estimate for this Project (Base Bid) is $6.7M.

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026