| Location: | Hawaii |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Mar 17, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The project includes, but is not limited to: temporary construction best management practices (BMP) including flow bypass measures, construction of new concrete over exposed wall footings, construction of new concrete swales, grouted riprap. The work shall also include water quality monitoring/documentation, analysis, and traffic controls during construction.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
RFB-DDC-1967607 Addendum No. 4.pdf
|

With GovernmentContracts, you can:
...HARBOR CONCRETE ROADWAY REPAIR WORK [BID DATE CHANGED FROM 5/29/2026, 6/5/2026] details view ...
General Contractors Association
Bid Due: 6/10/2026
...Bid Date: 2026-06-16 Project Description: The work for this project will construct (design-bid..., ...
General Contractors Association
Bid Due: 6/16/2026
...of the concrete culverts drainpipes. the major elements of the scope of work ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
...of the concrete culverts drainpipes. the major elements of the scope of work ...
DEPT OF DEFENSE
Bid Due: 7/30/2026