| Location: | Florida |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | May 14, 2026 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-15818 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 70131700 | Land and soil management |
| 70131703 | Land reclamation |
| 72141102 | Land grading service |
| 72141500 | Land preparation services |
| The St. Johns River Water Management District (the “District”) is seeking submittals from qualified contractors to efficiently restore a total of 82,438 linear feet (15.61 miles) of wildfire suppression lines installed on the Lake George Conservation Area, Heart Island Conservation Area, Clark Bay Conservation Area and the Sunnyhill Restoration Area West Tract to natural grade, so as not to channelize run-off nor disrupt sheet flow. Suppression lines consist of both dozer lines and plow lines. Dozer lines are installed with a dozer blade to improve access for equipment, typically leaving large windrows of debris adjacent to the fireline, averaging 10 to 20 feet in width. Plow lines are individual lines established with a fire plow averaging about 6 feet in width for an individual line (the “Work”). The estimated budget for the Work is $46,000. All Work must be completed by September 30, 2026. |
| Description | Date/Time |
| 42209QR26 NCR WF FL Rehab | Apr 29, 2026, 10:21:37 PM |

With GovernmentContracts, you can:
...Master Meters installed throughout the Water, Wastewater, and IQ distribution systems. Flow meters... ...
Collier County
Bid Due: 6/12/2026
...Bid Number: 25/26-010 Bid Title: FIELD SUPPORT SERVICES FOR AGRICULTURAL WATER USE MONITORING... ...
Suwannee River Water Management District
Bid Due: 7/01/2026
...Bid Number: 25/26-010 Bid Title: FIELD SUPPORT SERVICES FOR AGRICULTURAL WATER USE MONITORING... ...
Suwannee River Water Management District
Bid Due: 7/01/2026
...improvement intended to enhance water quality, increase system reliability, and strengthen fire flow.../2026 ...
Volusia County
Bid Due: 6/25/2026