Project Manual
4j Project Number:
CIP #462-904-P0124
Permit Documents
21 January 2026
PROJECT TITLE PAGE - 00 01 01
PROJECT TITLE PAGE
PROJECT TITLE:
SOUTH EUGENE HIGH SCHOOL
WINDOW REPLACEMENT 2026 - PHASE 3
PERMIT DOCUMENTS
400 East 19th Avenue
Eugene, Oregon 97401
OWNER:
EUGENE SCHOOL DISTRICT 4J
715 West 4th Avenue (Facilities Department)
Eugene, Oregon 97402
Tel (541) 514-7424
Contact: Dexter Rummel, Project Manager
Email: rummel_d@4j.lane.edu
ARCHITECT:
ROBERTSON/SHERWOOD/ARCHITECTS PC
132 East Broadway - Suite 540
Eugene, Oregon 97401
Tel (541) 342-8077
Contact: Ellie Johnson
Email: ejohnson@robertsonsherwood.com
DATE:
21 JANUARY 2026
END OF PROJECT TITLE PAGE
SEHS Window Replacement 2026
Phase 3
00 01 01 - 1
TABLE OF CONTENTS - 00 01 10
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - Project Title Page
00 01 10 - Table of Contents
00 01 15 - List of Drawing Sheets
00 11 16 - Invitation to Bid
00 21 13 - Instructions to Bidders
00 21 13.01 - AIA Document A701 - Instructions to Bidders
00 22 13 - Supplementary Instructions to Bidders
00 31 13 - Notice Summary
00 41 13 - Bid Form
00 45 22 - First-Tier Subcontractor Disclosure Form
00 52 13 - Form of Agreement
00 52 13.01 - AIA Document A101 Draft
00 72 13 - General Conditions
00 72 13.01 - AIA Document A201 - General Conditions
00 73 43 - Prevailing Wage Rates
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 11 00 - Summary of Work
01 11 00 A - Asbestos Containing Materials Notification
01 11 00 B - Asbestos Containing Materials Statement
01 11 00 C - Full-time Superintendent Disclosure
01 23 00 - Alternates
01 25 00 - Contractor Modification Procedures
01 25 01 - Change Request / Proceed Order
01 29 00 - Payment Procedures
01 31 00 - Project Management and Coordination
01 31 01 - Preconstruction Conference Agenda (Sample)
01 32 00 - Construction Progress Documentation
01 33 00 - Submittal Procedures
01 40 00 - Quality Requirements
01 43 39 - Integrated Field Mock-Ups
01 50 00 - Temporary Facilities and Controls
01 60 00 - Product Requirements
01 60 01 - Substitution Request Form
01 61 16 - Volatile Organic Compound (VOC) Content Restrictions
01 73 00 - Execution Requirements
SEHS Window Replacement 2026
Phase 3
00 01 10 - 1
TABLE OF CONTENTS - 00 01 10
01 73 29 - Cutting and Patching
01 74 19 - Construction Waste Management and Disposal
01 77 00 - Closeout Procedures
01 78 23 - Operation and Maintenance Data
01 78 39 - Project Record Documents
01 79 00 - Demonstration and Training
DIVISION 02 -- EXISTING CONDITIONS
02 41 00 - Demolition
DIVISION 03 -- CONCRETE
03 01 00 - Maintenance of Concrete
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 00 - Rough Carpentry
06 20 00 - Finish Carpentry
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 62 00 - Sheet Metal Flashing and Trim
07 90 05 - Joint Sealers
DIVISION 08 -- OPENINGS
08 43 13 - Aluminum-Framed Storefronts
08 80 00 - Glazing
08 87 23 - Safety and Security Films
DIVISION 09 -- FINISHES
09 90 00 - Paints and Coatings
DIVISION 12 -- FURNISHINGS
12 24 00 - Window Shades
END OF TABLE OF CONTENTS
SEHS Window Replacement 2026
Phase 3
00 01 10 - 2
LIST OF DRAWING SHEETS - 00 01 15
01 - GENERAL
G001-3
G002-3
G003-3
G004-3
G005-3
LIST OF DRAWING SHEETS
GENERAL INFORMATION
PHASING AND SITE ACCESS PLAN
EXISTING CONDITIONS - SITE PLAN
EXISTING CONDITIONS - EXTERIOR
EXISTING CONDITIONS - INTERIOR
01 - ARCHITECTURAL
A102-3 FLOOR PLAN
A201-3 EXTERIOR ELEVATIONS
A202-3 EXTERIOR ELEVATIONS
A203-3 EXTERIOR ELEVATIONS
A301-3 STOREFRONT TYPES
A302-3 HOLLOW METAL AND WOOD FRAME TYPES
A303-3 WINDOW DETAILS
A304-3 WINDOW DETAILS
A305-3 INTERIOR DETAILS
A306-3 INTERIOR DETAILS
A307-3 INTERIOR DETAILS
A401-3 WINDOW SHADE PLAN
END OF SECTION