Des Moines Airport Authority
Request for Statement of Qualifications
Hotel Development at Des Moines International Airport
Issue Date: March 10, 2026
Response Deadline: April 10, 2026
I. INTRODUCTION
The Des Moines Airport Authority (the "Authority") invites qualified real estate development
firms to submit a Statement of Qualifications (SOQ) to develop a select-service hotel on
airport-owned property located at the Des Moines International Airport (DSM).
The hotel will be developed under a ground lease agreement with the Authority and must
meet the vision, functional requirements, and architectural standards outlined in this
Request for Qualifications (RFQ). The Authority will give preference to a development firm
who is familiar with the Iowa market and has strong ties to the Des Moines metro. Although
the development will be considered non-aeronautical, the Authority will be required to
follow applicable Federal Aviation Administration rules and regulations.
II. VISION STATEMENT
The Des Moines Airport Authority began the redevelopment of commercial air service
operations with planning efforts in 2013. Since then, significant infrastructure
development has taken place, resulting in the current new terminal construction program.
As the terminal project is well on its path to phased completion, the Airport Authority is
ready to consider options on a complementing hotel property. A successful project would
include the timely construction and opening of a select-service, landmark hotel serving
DSM’s growing passenger traffic that enhances the overall airport campus. The Authority
seeks a partner on this project who is well-versed in hotel development and able to achieve
the property’s highest and best use.
III. PROJECT OVERVIEW
The Authority seeks a modern design that complements DSM’s long-term development
plan and creates a strong sense of place for both travelers and the central Iowa
1
community. The site description begins on page six of this RFQ. Renderings on Exhibit A
are examples only and not intended to dictate the layout. The location of the skywalk to the
parking garage was planned for in the construction of the garage, and the garage stair tower
closest to the site includes a vacant elevator shaft.
The Authority expects to enter a long-term land lease for the site (40 -50 years), subject to
Federal Aviation Administration approval. Compensation for the land lease will be
negotiated as part of the entire project, along with terms related to potential Authority
office space. The Authority is open to a range of options such as the developer owning the
entire structure to Authority participation in the building and other necessary
improvements.
The proposed hotel should include, but is not limited to, the following key elements:
• Guest Facilities: No fewer than 120 well-appointed guest rooms and adequate
meeting space for events of up to 50 people.
• Skywalk Connection: Direct pedestrian skywalk connection to the airport parking
garage.
• Rooftop Bar: A rooftop bar and restaurant offering views of both the airfield and
downtown Des Moines. Based on Authority analysis, the FAA Part 77 Airspace
requirements limit the height of the building to approximately 150 feet, but
approximately 90 feet above ground level would provide the views desired.
• Airport Authority Offices: Office space for the Des Moines Airport Authority on the
ground floor. The Authority would be interested in negotiating an arrangement to
house staff, and potentially other tenants, on the ground floor of the hotel.
• Building Height: A minimum of eight stories, with the rooftop bar located at least 90
feet above ground level.
• Parking: Surface parking will be required around the building. Some space will be
available in the airport parking garage, but the Authority would expect to maximize
surface parking around the site as well.
• Geotech Analysis: The Authority has conducted preliminary geotechnical analysis
on the site. Additional analysis would be completed based on design and location
of vertical circulation. If fill dirt is required for the site, the Authority has a borrow
site available.
The City of Des Moines has two programs that may be applied for to assist in making the
project financially feasible. The first is a Tax Abatement program that could be either a
2
three-year, 100% abatement or a 10-year tax abatement with a declining schedule. The
other is Tax Increment Financing (TIF) that is available due to the site being located within
the Airport Development Urban Renewal Plan Area. Please contact the City's Economic
Development Office to discuss these programs.
IV. QUALIFICATIONS
The Authority is seeking a developer or development/investor team that meets the
following minimum qualifications. The criteria will be weighted as indicated.
1. Proven Hotel Development Experience and Vision for the Project (40%):
Demonstrated experience in the successful development of at least two (2) select-
service hotels of similar scale and complexity, along with a plan for how the site
would be used to meet the Project Overview elements above.
2. Hotel Industry Relationships (30%): Established relationships with national or
international hotel brands, operators, and investors.
3. Construction Management Expertise (20%): Experience overseeing the design and
construction of high-rise hotel projects, particularly those exceeding eight stories,
with timely project delivery.
4. Knowledge of the Des Moines Market (10%): Demonstrated understanding of local
market dynamics, permitting processes, and stakeholder engagement in the Des
Moines region.
V. SUBMISSION REQUIREMENTS
Interested developers shall submit a SOQ that includes the following:
• Cover Letter (1 page): Introduce your firm/team and summarize interest and
qualifications, including overview of firm history, ownership structure, and areas of
expertise.
• Relevant Experience: Detailed descriptions of comparable hotel developments
completed in the past 10 years, including images, project size, cost, completion
date, and roles.
• Key Personnel: Brief bio of principal team members who would be assigned to the
project.
3
• Hotel Brand Partnerships: Letters of interest or past partnership examples with
hotel operators or franchises.
• Construction Management Capabilities: Evidence of experience managing hotel
construction at or above eight stories.
• Des Moines Market Knowledge: Narrative describing your team’s familiarity with
the region and past work within Central Iowa.
• Project Narrative: Brief narrative explaining the developer’s vision for the project.
• References: At least three (3) references from clients or public agencies for similar
projects.
Note: The Authority is not looking for volume in the submission requirements, but rather
content which directly addresses the topics mentioned above. The intent is for proposers
to provide a focused overview of your organization, your capabilities, vision for this project
and how you will deliver the project in a timely manner.
VI. SELECTION PROCESS
This RFQ is the first phase in a two-phase selection process. Following review of SOQs, a
shortlist of qualified developers will be developed in rank order. The first ranked developer
will be invited to develop a development plan and negotiate the financial package for the
project. If negotiations have not reached an acceptable point within 90 days with the first
ranked developer, the Authority will move on to enter negotiations with the second ranked
developer.
VII. SUBMISSION INSTRUCTIONS
Deadline: All SOQs must be submitted electronically to airinfo@flydsm.com or in hard
copy to 5800 Fleur Drive, Room 207, Des Moines, IA 50321 by 4:00 pm local time, April
10, 2026. Hard copy SOQs must include an electronic copy via USB drive.
4
Contact:
Brian Mulcahy
Chief Executive Officer
Des Moines Airport Authority
5800 Fleur Drive, Room 207, Des Moines, IA 50321
Email: bcmulcahy@flydsm.com
Format:
• PDF format preferred
• Maximum 30 pages, excluding cover and appendices
Late submissions will not be considered.
VIII. PRE-SUBMISSION MEETING AND QUESTIONS
A meeting will be held at the Des Moines International Airport Terminal Cloud Room on
March 17, 2026, at 1:00 pm Central Time, to discuss this RFQ and tour the proposed site.
All questions regarding this RFQ must be received in writing (hard copy or email) to the
contact above by close of business March 20, 2026. Responses to all questions will be
posted as an addendum on the Authority's website by close of business March 23, 2026.
IX. RIGHTS RESERVED
The Authority reserves the right to amend, cancel, or reissue this Request; to reject any or
all responses; and to negotiate with any respondent deemed qualified. This document
does not constitute a contract or offer of any kind.
We appreciate your interest in advancing the vision for the Des Moines International
Airport and look forward to your submission.