SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the Conditions of the Contract and
Division 01 Specification Sections apply to this Section.
1.2 SUMMARY
A. Section includes removal and disposal of the existing roofing systems, gutters, downspouts, coping,
insulation, flashings, and all construction related debris. Installation of the new roofing systems as
specified with all applicable details for a complete watertight warrantied roofing assembly per the
manufacturers instructions.
B. Related Work Specified Elsewhere:
1. Section 06 - Rough Carpentry
2. Section 07: KEE Membrane Roofing
3. Section 07: Sheet Metal Flashing and Trim
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Central Unified School District Roofing Project 2026
B. Project Location: Harvest Elementary School 6514 W Gettysburg Ave, Fresno, Ca 93723
C. Owner: Central Unified School District 5652 W Gettysburg Ave, Fresno, CA 93722
D. General scope of work but not limited to;
E. Harvest Elementary School Roof Project 2026
1. Includes removal and disposal of existing roofing system(s), insulation board, gutters, downspouts,
flashings, metal wall panels, wall vents, etc. for a complete prepared roof surface at the low slope
roof section.
2. The coping cap will be removed and reinstalled once the full roof system is completed. Install Tuff
Stuff Sealant at each internal butt plate or lap joint.
3. Replace all roof drains, drain rings, drain baskets, and drain pipes down to the elbow with new Zurn
or equal drain assembly.
SECTION 01 11 00 - SUMMARY OF WORK 1
4. Modify existing HVAC curb, add blocking to square the curb, install a new 24 gauge galvanized
sheetmetal pan.
5. Install one layer of rosin paper over the entire wood roof deck at the low slope roof sections.
6. Install one layer of 12" Woodfiber insulation board with screws and plates, 16 per 4'x 8' sheet.
7. Install one layer of Flexbase 80 in Greenlock Adhesive at all horizontal and vertical surfaces.
8. Install KEE Stone HP membrane adhered at all horizontal surfaces per manufactures details.
9. Install KEE Stone HP NF 60 mil membrane adhered at all vertical surfaces per manufacturers
details.
10. Install new SolarBright boots at all pipe penetrations.
11. Install new 24 gauge galvanized sheet metal skirt flashing at all HVAC and roof curbs.
12. Install new PVC condensate lines from all HVAC units to the drains. Install new rubber blocking to
properly support the new condensate line, maximum spacing 5' on center.
13. Install SolarBright walkway pad at all four sides of the HVAC units with a path to the roof hatch and under
all support blocking.
14. If necessary, Include in the bid price a City of Porterville Re-Roof permit. The permit is to be pulled by the
roofing contractor and all inspections are the responsibility of the roofing contractor.
1.4 WORK COMPLETED BY THE DISTRICT
A. No work will be completed by the district.
1.5 TYPE OF CONTRACT
A. Work will be completed under a single prime contract.
1.6 USE OF PREMISES
A. General: Contractor will have limited use of premises for construction operations.
B. Use of site: Limit use of premises to work areas required. Do not disturb portions of the project site
beyond areas in which the work is indicated.
C. The building interior is off limits to the contractor. All access shall be from the exterior.
D. The point of exterior access must be approved by the owner.
E. Entrances: Keep all entrances serving the building clear and available to the owner, owner's
employees, and emergency vehicles.
F. Use of existing building: Maintain existing building in a weather tight condition throughout the
construction period. Repair damage caused by construction operations. Protect building and
occupants during construction.
G. Vehicle Parking: Contractor parking is available on site and will need to be approved by the owner.
H. Assume full responsibility for protection and safekeeping of materials stored on premises. Coordinate
the location of materials and equipment to be stored on premises. Provide barricades, barriers, and
enclosures as required to ensure safety.
SECTION 01 11 00 - SUMMARY OF WORK 2
1.7 OWNERS OCCUPANCY REQUIREMENTS
A. The owner will occupy the building during the entire construction phase. Cooperate with the owner
during construction operations to minimize owner conflicts and facilitate owner usage. Perform the
work as to not interfere with owners operations.
B. A minimum of 72 hours notice is needed for all activities that will affect the owners operations.
1.8 WORK RESTRICTIONS
A. On site work hours: Work shall generally be performed from the hours of 7:00 am - 5:00 pm Monday
through Friday except as otherwise indicated or approved by the owner.
1. Weekend hours, early morning hours, utility shut down, and noisy activity requires owner's
authorization a minimum of 72 hours in advance.
1.9 UNIT PRICES
A. The following unit prices will be used to add or deduct from the total contract amount.
a. Unit-1 Replacement of dryrot wood roof decking, add a line items per square foot cost to
proposal form.
1.10 SCHEDULE OF ALTERNATES
A. None
1.11 PROJECT CONDITIONS
A. Proceed with roofing work only when existing and forecasted weather conditions will permit a unit of
work to be installed in accordance with manufacturer's recommendations and warranty requirements.
B. Do not apply roofing insulation or membrane to damp deck surface.
C. Do not expose materials subject to water or solar damage in quantities greater than can be
weatherproofed during same day.
1.12 SEQUENCING AND SCHEDULING
A. Sequence installation of roofing with related units of work specified in other sections to ensure that roof
assemblies, including roof accessories, flashing, trim and joint sealers, are protected against damage
from effects of weather, corrosion and adjacent construction activity.
B. Complete all roofing field assembly work each day. Phased construction will not be accepted.
1.13 PROJECT TIME LINE
A. Advertisement 1: 04/09/2026
B. Advertisement 2: 04/16/2026
C. Pre Bid Meeting: 04/16/2026 at 9:00am
D. Bid Date: 04/23/2026 at 2:00pm
E. Project Completion Date: TBD
END OF SECTION 01 11 00 - SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK 3
SECTION 01 30 00
SUBMITTALS
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Contract General Conditions.
B. See also contract general conditions for additional requirements especially those
regarding requests for ALTERNATIVES OR EQUALS and for SUBSTITUTIONS.
1.02 SUMMARY
A. This Section specifies administrative and procedural requirements for submittals required
for performance of the Work, including:
1. Contractor's construction schedule
2. Submittal schedule
3. Shop Drawings
4. Product Data
5. Samples.
B. Administrative Submittals: Refer to other Division1 Sections and other Contract
Documents for requirements for administrative submittals. Such submittals include, but
are not limited to:
1. Permits
2. Applications for payment
3. Performance and payment bonds
4. Insurance certificates
5. List of Subcontractors.
1.03 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of
construction activities. Transmit each submittal sufficiently in advance of performance of
related construction activities to avoid delay.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other
submittals and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related elements of the
Work so processing will not be delayed by the need to review submittals
concurrently for coordination.
a. The Architect shall return without action any submittals requiring
coordination with other submittals until related submittals are
coordinated.
3. Processing: Allow sufficient review time so that installation will not be delayed as a
result of the time required to process submittals, including time for resubmittals.
a. See General Conditions and Supplementary General Conditions for
additional requirements.
b. If an intermediate submittal is necessary, process the same as the initial
submittal.
c. No extension of Contract Time will be authorized because of failure to
transmit submittals to the Architect sufficiently in advance of the Work to
permit processing.
Section 01 30 00 - 1
B. Submittal Preparation: Place a permanent label or title block on each submittal for
identification. Indicate the name of the entity that prepared each submittal on the label or
title block.
1. Provide a space approximately 4" x 5" on the label or beside the title block on
Shop Drawings to record the Contractor's review and approval markings and the
action taken.
2. Include the following information on the label for processing and recording action
taken:
a. Project name
b. Date
c. Name and address of Architect
d. Name and address of Contractor
e. Name and address of subcontractor
f. Name and address of supplier
g. Name of manufacturer
h. Number and title of appropriate Specification Section
i. Drawing number and detail references, as appropriate.
C. Submittal Transmittal: Package each submittal appropriately for transmittal and handling.
Transmit each submittal from Contractor to Architect using a transmittal form. Submittals
received from sources other than the Contractor will be returned without action.
On the transmittal Record relevant information and requests for data. On the form, or
separate sheet, record deviations from Contract Document requirements, including minor
variations and limitations. Include Contractor's certification that information complies with
Contract Document requirements.
1.05 SHOP DRAWINGS
A. Submit newly prepared information, drawn to accurate scale. Highlight, encircle, or
otherwise indicate deviations from the Contract Documents. Do not reproduce Contract
Documents or copy standard information as the basis of Shop Drawings. Standard
information prepared without specific reference to the Project is not considered Shop
Drawings.
B. Shop Drawings include fabrication and installation drawings, setting diagrams, schedules,
patterns, templates and similar drawings. Include the following information:
Dimensions
Identification of products and materials included
Compliance with specified standards
Notation of coordination requirements
Notation of dimensions established by field measurement.
C. Sheet Size: Except for templates, patterns and similar full size Drawings, submit Shop
Drawings on sheets at least 81/2" x 11" but no larger than 30" x 42".
D. Submittals: Submit one correctable translucent reproducible print and six (6) blue or
blackline print for the Architect's review; the reproducible and one print will be returned.
Do not use Shop Drawings without an appropriate final stamp indicating action taken in
connection with construction.
Section 01 30 00 - 2
1.06 PRODUCT DATA
A. Collect Product Data into a single submittal for each element of construction or system.
Product Data includes printed information such as manufacturer's installation instructions,
catalog cuts, standard color charts, roughingin diagrams and templates, standard wiring
diagrams and performance curves. Where Product Data must be specially prepared
because standard printed data is not suitable for use, submit as "Shop Drawings."
1. Mark each copy to show applicable choices and options. Where printed Product
Data includes information on several products, some of which are not required,
mark copies to indicate the applicable information. Include the following
information:
Manufacturer's printed recommendations,
Compliance with recognized trade association standards,
Compliance with recognized testing agency standards,
Application of testing agency labels and seals,
Notation of dimensions verified by field measurement,
Notation of coordination requirements.
2. Do not submit Product Data until compliance with requirements of the Contract
Documents has been confirmed.
B. Submittals: Submit a minimum of six (6) copies of each required submittal as well as
additional copies as required by the Architect, (the actual number of submittals and
distribution required shall be determined by the Trustees Representative at the
Preconstruction Conference). The Architect will return two sets marked with action taken
and corrections or modifications required.
C. Distribution: Furnish copies of final submittal to installers, subcontractors, suppliers,
manufacturers, fabricators, and others required for performance of construction activities.
1. Do not proceed with installation until an applicable copy of Product Data applicable
is in the installer's possession.
2. Do not permit use of unmarked copies of Product Data in connection with
construction.
1.07 SAMPLES
A. Submit full-size, fully fabricated Samples cured and finished as specified and physically
identical with the material or product proposed. Samples include partial sections of
manufactured or fabricated components, cuts or containers of materials, color range sets,
and swatches showing color, texture and pattern.
1. Mount, display, or package Samples in the manner specified to facilitate review of
qualities indicated. Prepare Samples to include the following:
Generic description of the Sample
Sample source
Product name or name of manufacturer
Compliance with recognized standards
Availability and delivery time.
2. Submit Samples for review of kind, color, pattern, and texture, for a final check of
these characteristics with other elements, and for a comparison of these
characteristics between the final submittal and the actual component as delivered
and installed.
B. Preliminary submittals: Where Samples are for selection of color, pattern, texture or
similar characteristics from a range of standard choices, submit a full set of choices for
Section 01 30 00 - 3
the material or product.
Preliminary submittals will be reviewed and returned with the Architect's mark indicating
selection and other action.
C. Submittals: Except for Samples illustrating assembly details, workmanship, fabrication
techniques, connections, operation and similar characteristics, submit 3 sets; one will be
returned marked with the action taken.
Maintain sets of Samples, as returned, at the Project site, for quality comparisons
throughout the course of construction.
D. Distribution of Samples: Prepare and distribute additional sets to subcontractors,
manufacturers, fabricators, suppliers, installers, and others as required for performance
of the Work.
Field Samples specified in individual Sections are special types of Samples. Field
Samples are full-size examples erected on site to illustrate finishes, coatings, or finish
materials and to establish the standard by which the Work will be judged.
1.08 ARCHITECTS ACTION
A. Except for submittals for record, information or similar purposes, where action and return
is required or requested, the Architect will review each submittal, mark to indicate action
taken, and return promptly.
Compliance with specified characteristics is the Contractor's responsibility.
B. Action Stamp: The Architect will stamp each submittal with a uniform, self-explanatory
action stamp. The stamp will be appropriately marked, as follows, to indicate the action
taken:
1. Final Unrestricted Release: Where submittals are marked "Approved," that part of
the Work covered by the submittal may proceed provided it complies with
requirements of the Contract Documents; final acceptance will depend upon that
compliance.
2. Final-But-Restricted Release: When submittals are marked "Approved as Noted,"
that part of the Work covered by the submittal may proceed provided it complies
with notations or corrections on the submittal and requirements of the Contract
Documents; final acceptance will depend on that compliance.
3. Returned for Resubmittal: When submittal is marked "Not Approved, Revise and
Resubmit," do not proceed with that part of the Work covered by the submittal,
including purchasing, fabrication, delivery, or other activity. Revise or prepare a
new submittal in accordance with the notations; resubmit without delay. Repeat if
necessary to obtain a different action mark.
a. Do not permit submittals marked "Not Approved, Revise and
Resubmit" to be used at the Project site, or elsewhere where Work is in
progress.
b. Note: Any work performed prior to receiving a FULLY APPROVED
submittal shall be done at the contractors own risk and is subject to
being replaced if any of the submittal requirements are not met.
Section 01 30 00 - 4
PART 2 - PRODUCTS NOT USED
PART 3 - EXECUTION NOT USED
END OF SECTION 01300
Section 01 30 00 - 5
SECTION 01 64 00
OWNER FURNISHED CONTRACTOR INSTALLED (O.F.C.I)
PART 1 - GENERAL
1. SUMMARY
A. DESCRIPTION: The Owner shall procure and provide certain products for installation as
shown and specified per Contract Documents.
B. RELATED WORK SPECIFIED ELSEWHERE:
1. General: Products furnished and paid for by the Owner are described in the
following technical sections and /or in the Drawings as O.F.C.I. materials.
2. Note that this project includes the installation of owner-supplied materials as
noted in this specification section only. All materials not specifically listed below
will be the responsibility of the contractor to provide and install.
2. DEFINITIONS
A. GENERAL: The following are used to identify products as noted on the Drawings.
B. OWNER FURNISHED CONTRACTOR INSTALLED (O.F.C.I.): Products or equipment
furnished by the Owner for installation under this contract.
C. OWNER FURNISHED OWNER INSTALLED (O.F.O.I.): Products or equipment to be
provided and installed by the Owner, but requiring surfacing, backing, utility connections
or other preparation under this contract, for proper installation.
D. NOT IN CONTRACT (N.I.C.): Products or equipment to be provided and installed by
Owner, not requiring surfacing, backing, utility connections or other preparation under this
contract.
PART 2 - PRODUCTS
1. PRODUCTS
A. ROOFING MATERIAL FURNISHED BY OWNER (O.F.C.I.): District supplied material.
Related specification sections include;
1. Section 06 - Rough Carpentry
2. Section 07- KEE Membrane Roofing
3. 3. Section 07- Sheet Metal Flashing and Trim
B. MATERIAL LIST
OWNER FURNISHED CONTRACTOR INSTALLED
01 64 00 - 1
| HARVEST ELEM | ENTARY SCHOOL | ||
|---|---|---|---|
| 20.00 | KEE-Lock Spatter Spray | ||
| 58.00 | KEE-Stone FB 60 | ||
| 62.00 | KEE-Stone NF 60 Flashing | ||
| 588.00 | FlexBase Plus 80 | ||
| 165.00 | Green-Lock Plus Flashing Adh | ||
| 232.00 | Green-Lock Plus Membrane Adh | ||
| 3.00 | KEE/PVC Walkway Roll 30' x 60' | ||
| 42.00 | KEE-Lock Flashing Adhesive | ||
| 100.00 | R-Mer Flat Stock 22G S |
1. The Owner will only supply the quantity listed in the owner supplied materials
section of this specification below. All additional materials and accessories will be
the full responsibility of the contractor to provide and install per the specification
and project requirements.
2. Any and all material or accessories required for the installation of the roof system
in excess of the district provided material must be supplied and installed by the
Contractor. It is up to the Contractor to determine the precise amount of material
required for the completion of this project; and to provide excess material, as
required. The cost to handle and break flashing metal from the District provided
flat stock is contractor's responsibility.
3. All required flashings as required per each specification section for plumbing,
electrical, gas, etc. will be the Contractors responsibility to provide and install as
well as to be included in the bid cost.
4. All materials not specifically included in the owner supplied materials section will
be the responsibility of the contractor to provide and install in compliance with the
respective specification section. Below is the list of materials the owner will
provide.
5. Freight charges of owner supplied materials will be the responsibility of the
Owner.
6. Contractor must coordinate and take delivery of materials, count all materials and
ensure it matches the list supplied in this section, unload and properly locate
materials at the job site, and properly protect, cover and store at job site.
7. Contractor must be able to provide certification in writing from roof system
manufacturer that the contractor is approved to install the specified roof system
and provide all warranty requirements of each respective specification section.
HARVEST ELEMENTARY SCHOOL
20.00 KEE-Lock Spatter Spray
58.00 KEE-Stone FB 60
62.00 KEE-Stone NF 60 Flashing
588.00 FlexBase Plus 80
165.00 Green-Lock Plus Flashing Adh
232.00 Green-Lock Plus Membrane Adh
3.00 KEE/PVC Walkway Roll 30' x 60'
42.00 KEE-Lock Flashing Adhesive
100.00 R-Mer Flat Stock 22G S
PART 3 - EXECUTION
1. OWNER'S RESPONSIBILITIES
A. SUBMITTALS: Arrange for and deliver necessary shop drawings, product data and
samples to Contractor.
OWNER FURNISHED CONTRACTOR INSTALLED
01 64 00 - 2

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026