| Location: | Florida |
|---|---|
| Posted: | Feb 6, 2025 |
| Due: | Feb 18, 2025 |
| Agency: | Jea |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Riverview STPO scope of services to be performed shall consist of conceptual design, final detailed design services, construction management and inspection services during construction for sewer system improvements, which may include pump station(s), gravity sewer and/or vacuum-style collection system infrastructure, and water main distribution system and other infrastructure improvements within project rights-of-way. It also includes individual final detailed design of the on-site water and sewer connection to each existing structure participating within the project footprint. Design services will include proper abandonment of septic tanks on the non-vacant lots that are participating. Design services for non-residential properties may be included in the scope of services.
USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/918210/
Mandatory Pre-Response Meeting: January 06, 2025, at 10:00 AM
Response Due Date: March 04, 2025
Response Due Date: February 11, 2025
Response Due Date: February 18, 2025

With GovernmentContracts, you can:
...for preparing an Environmental Impact Statement (EIS) in accordance with Department of Defense... ...
Okaloosa County
Bid Due: 10/08/2026
...unique challenges related to compatibility, utility infrastructure, environmental resources... reliable electric, water, wastewater, ...
City of Lakeland
Bid Due: 10/05/2026
...is highly susceptible to impacts from extreme weather events such as hurricanes. Localized ...
City of Daytona Beach
Bid Due: 9/22/2026