| Location: | Connecticut |
|---|---|
| Posted: | Feb 10, 2026 |
| Due: | Mar 12, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB No. 2026-012 |
| Publication URL: | To access bid details, please log in. |
The project consists of: the reconfiguration and construction of an approximate 130-space surface parking lot in front of the terminal building. The project includes the reclamation of the access road and approximately 70,000 square feet of the existing parking lot. New bituminous concrete pavement will be placed on the reclaimed surfaces. The remaining paved parking area will be permanently removed and replaced with grass. The project also consists of curbing, drainage, utilities (water, sewer and gas) site lighting, landscaping, EV charging stations and other site amenities. The contract time for completion of all work is within One-Hundred and Eighty (180) calendar days from the date specified in the “Notice to Proceed”.
Kevin Lynch Connecticut Airport Authority Windsor Locks CT, 06096 United States Tel: Fax: procurement@ctairports.org

With GovernmentContracts, you can:
...Sidewalk Reconstruction on Fleetwood Drive and Hilltop Road The Town of Plainville acting ...
State Government of Connecticut
Bid Due: 6/30/2026
...2026-08 HIGH STREET WATER MAIN REPLACEMENT II & ROAD RECONSTRUCTION Sealed Bids for ...
State Government of Connecticut
Bid Due: 7/07/2026
...Bid 2027-03E Sidewalk Reconstruction on Fleetwood Drive and Hilltop Road Reference Number: 2027...-03E ...
Plainville town
Bid Due: 6/30/2026
..., Century, and Division Street, which includes full-depth reconstruction, paving, fine milling... Specifications ...
Town of Beacon Falls
Bid Due: 7/02/2026