| Location: | Idaho |
|---|---|
| Posted: | Feb 26, 2025 |
| Due: | Mar 14, 2025 |
| Agency: | City of Boise |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FB-2025-046 |
| Publication URL: | To access bid details, please log in. |
Replace the existing 10” and 12” Fiberglass geothermal lines between the Capitol Bridge and the greenbelt tunnel with new 12” and 16” high-temperature HDPE Platinum Stripe pipes.
Open: 2/26/2025 12:30 PM MST
Close: 3/14/2025 10:00 AM MDT
Type: FB-
Number: FB-2025-046
Contact:
Details:

With GovernmentContracts, you can:
...Control drum actuators The Heat Management System (HMS) heat pipes Power Conversion System ...
ENERGY, DEPARTMENT OF
Bid Due: 9/24/2026
...Geothermal HDPE Materials (GEO1006) Geothermal HDPE Pipe and fittings to replace main lines ...
City of Boise
Bid Due: 9/30/2026
...-inch diameter, 777 L.F. of 10-inch diameter, and 2,450 L.F. of 8-inch diameter ...
City of Boise
Bid Due: 9/25/2026