| Location: | Georgia |
|---|---|
| Posted: | Jul 9, 2026 |
| Due: | Aug 11, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77548-NONST-2027-000000393 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77548-NONST-2027-000000393 | 26-0078-3 Salcedo Lift Station Rehabilitation Project | Chatham County |
Jul 09, 2026 @ 09:18 AM
|
Aug 11, 2026 @ 02:00 PM
|
Start Date: Jul 09, 2026 @ 09:18 AM ET
End Date:
Aug 11, 2026 @ 02:00 PM ET
This project involves the rehabilitation of an existing pump station owned and operated by Chatham County at 2505 Salcedo Ave, Savannah, GA 31406. The pump station is a duplex submersible pump station. The rehabilitation scope includes removing the existing pumps and replacing them with new pumps and associated piping, fittings, valves. The scope of the rehabilitation includes pigging the existing force main, constructing a new discharge valve vault, installation of auxiliary equipment such as a permanent bypass pump and electrical and SCADA work associated with such.
| Code | Description |
| 89066 | Sewer Lift Stations, Including Parts and Accessories |
| 90930 | Building Construction, (Not Otherwise Classified) |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
Felix Espada Jr.
fespada@chathamcounty.org
912-790-1624

With GovernmentContracts, you can:
...Project: REMOVAL & INSTALLATION OF (2) 750 GPM VERTICAL TURBINE PUMPS MORGAN DAIRY ...
Floyd County
Bid Due: 9/21/2026
...26-025 REMOVAL & INSTALLATION OF (2) 500 GPM VERTICAL TURBINE PUMPS BURNETT FERRY ...
State Government of Georgia
Bid Due: 9/21/2026
...26-031 REMOVAL & INSTALLATION OF (2) 750 GPM VERTICAL TURBINE PUMPS MORGAN DAIRY ...
State Government of Georgia
Bid Due: 9/21/2026
...Project: REMOVAL & INSTALLATION OF (2) 500 GPM VERTICAL TURBINE PUMPS BURNETT FERRY ...
Floyd County
Bid Due: 9/21/2026