| Location: | District of Columbia |
|---|---|
| Posted: | Jan 7, 2025 |
| Due: | Feb 6, 2025 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP-24-29241 |
| Publication URL: | To access bid details, please log in. |
RFP-24-29241: Terminal 1 Historic Façade Repair, DCA
NEW
Description: The Contractor shall repair the existing eight concrete columns and top beam along the front façade of Terminal 1 at Ronald Reagan Washington National Airport (DCA). Work includes removal of deteriorated concrete around columns and overhead beam, installing new cementitious material, epoxy injection, relocation of electrical conduits and painting to match surrounding paint.
Solicitation Issue Date: January 6, 2025
Due Date for Submissions: February 6, 2025
Amendments Issued: None
SLBE Requirement: None
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain ...
ARCHITECT OF THE CAPITOL
Bid Due: 7/17/2026
...and Institutional Building Construction size standard is $45.0 million. 238210 - Electrical Contractors... ...
SMITHSONIAN INSTITUTION
Bid Due: 6/16/2026
...Building Construction size standard is $45.0 million. 238210 - Electrical Contractors and Other... ...
SMITHSONIAN INSTITUTION
Bid Due: 6/16/2026
...of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical... ...
ARCHITECT OF THE CAPITOL
Bid Due: 7/17/2026