MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS - BP03A-CONCRETE

Location: California
Posted: Aug 19, 2025
Due: Sep 9, 2025
Agency: UCLA Capital Programs
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 908736.01
Publication URL: To access bid details, please log in.
Project Name MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS – BP03A-CONCRETE
Project Number 908736.01
Project Description Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited from prequalified Concrete Subcontractors for the following work:

1. The 5 story Medical Office Building (MOB) is located at 5901 West Olympic Boulevard, approximately 6 miles east of the UCLA Campus and is approximately 95,607 GSF. The proposed project would include seismic improvements on all floor levels and interior tenant improvements of approximately 34,000 GSF of space on floors 1-3. The MOB has a current Seismic Performance Rating of V. Upon completion of the work, the MOB would achieve a Seismic Performance Rating of IV or better and bring the facility into compliance with the UC Seismic Safety Policy. The proposed seismic work will include the installation of approximately 34 seismic dampers placed at specified locations on the inside perimeter of the building's exterior walls. The dampers will be installed diagonally and attached at the bottom and top of the existing steel column bays requiring incidental fireproofing at beam and column modifications. Steel reinforcing plates will be added to existing steel beams and columns to support the installation of seismic damper brackets. Additional seismic reinforcing is required at the existing rooftop mechanical penthouse and at the building foundation at locations along the 1st floor seismic dampers. In addition to the seismic work, work would also include partial restoration of interior building finishes impacted by the installation of the seismic braces. Limited MEP investigation and safe-off work is anticipated. Site and building accessibility improvements would include path of travel upgrades along the city sidewalk and building entrance, installation of new ADA handrails and guardrails at existing interior stairs. New accessible signage, restrooms and a drinking fountain are also anticipated.

Bid Package 03A-Concrete Description: The anticipated concrete scope includes concrete infill of existing slab on grade where concrete was removed to facilitate new underground utilities.

TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, ETC.), CLICK HERE: UCLA ONLINE PLANROOM
Estimated Construction Cost $100,000.00
908736.01
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., and underground utility work. The Project must be fully completed within one ...

City of Arcata

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.