| Project Name | MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS – BP09A-FRAMING & DRYWALL | ||
| Project Number | 908736.01 | ||
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited from prequalified Framing & Drywall Subcontractors for the following work:
1. The 5 story Medical Office Building (MOB) is located at 5901 West Olympic Boulevard, approximately 6 miles east of the UCLA Campus and is approximately 95,607 GSF. The proposed project would include seismic improvements on all floor levels and interior tenant improvements of approximately 34,000 GSF of space on floors 1-3. The MOB has a current Seismic Performance Rating of V. Upon completion of the work, the MOB would achieve a Seismic Performance Rating of IV or better and bring the facility into compliance with the UC Seismic Safety Policy. The proposed seismic work will include the installation of approximately 34 seismic dampers placed at specified locations on the inside perimeter of the building's exterior walls. The dampers will be installed diagonally and attached at the bottom and top of the existing steel column bays requiring incidental fireproofing at beam and column modifications. Steel reinforcing plates will be added to existing steel beams and columns to support the installation of seismic damper brackets. Additional seismic reinforcing is required at the existing rooftop mechanical penthouse and at the building foundation at locations along the 1st floor seismic dampers. In addition to the seismic work, work would also include partial restoration of interior building finishes impacted by the installation of the seismic braces. Limited MEP investigation and safe-off work is anticipated. Site and building accessibility improvements would include path of travel upgrades along the city sidewalk and building entrance, installation of new ADA handrails and guardrails at existing interior stairs. New accessible signage, restrooms and a drinking fountain are also anticipated. Bid Package 09A-Framing & Drywall Description: The anticipated drywall and framing scope of work includes all metal stud framing, insulation, drywall, taping and finish work associated with the updated interior layout on levels 1, 2, and 3. Installation of hollow metal door frames, and construction of a new shaft from levels 1 to 5. Ligature resistant considerations and scope apply to this bid package including impact-resistant drywall where shown per plan and coordination with other trades to ensure ligature resistant details installed correctly. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
||
| Estimated Construction Cost | $4,000,000.00 | ||
| Announcement to PQ Bidders | |||
| 906021.01 | |||

With GovernmentContracts, you can:
...elements, the structural sign frame to support the digital signage assembly, catwalk framing...
City of Los Angeles
Bid Due: 6/19/2026
...includes, but is not limited to, demolition, plumbing, framing, mechanical, electrical, and finish ...
City of Benicia
Bid Due: 6/30/2026
...Construction 238120: Structural Steel and Precast Concrete Contractors Construction 238130: Framing...
City of Los Angeles
Bid Due: 6/11/2026
...on the roof on the existing steel framing at the existing location. 5.2.5.1 ...
DEPT OF DEFENSE
Bid Due: 6/16/2026