| Location: | Texas |
|---|---|
| Posted: | Nov 18, 2024 |
| Due: | Dec 20, 2024 |
| Agency: | Lower Colorado River Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 000000071B |
| Publication URL: | To access bid details, please log in. |
Project Description: Use a hydraulic dredge and six-inch pump to remove materials from within the prescribed work area limits as indicated in Statement of Work document, pond dimensions are 340 ft x 210 ft x 15 ft. Remove materials from the pond bottom to within 3-6 inches above the original design depth of EL +325’-0” of the Combustion By-products Landfill (CBL) pond. Use geotextile containment bag(s) for placement of the dredge material within the prescribed material placement areas. Approximately 4-6 ft of gypsum material is present along with silt, sand and mud. More details available on Statement of Work document.

With GovernmentContracts, you can:
Spirit Apparel and Promotional Items Solicitation ID: 26-07-2040RFP Due Date: 6/30/2027 Due Time:
State Government of Texas
Bid Due: 6/30/2027
Bid #. Bid Title Addendums Closing Date Closing Time Buyer 2324-027-2029-B Online Only
Eagle Mountain-Saginaw Independent School District (EMS ISD)
Bid Due: 6/30/2027
Due Date: October 27, 2026 2:00 PM Park Name: Silver Lake State Park,
Texas Parks and Wildlife Department
Bid Due: 10/27/2026
Grease Trap Services Solicitation ID: 005-27 Due Date: 9/24/2026 Due Time: 2:00 PM
State Government of Texas
Bid Due: 9/24/2026