| Location: | Texas |
|---|---|
| Posted: | Sep 15, 2025 |
| Due: | Oct 13, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-067 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument
and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.
General Contractor shall self-perform a minimum of 51% of this project.
Liquidation Fee is $1000.00 for each day of delay.

With GovernmentContracts, you can:
...Bid Information Type Request for Bid Status Issued Number REQ00003565 (Water Treatment Support... ...
City of Garland
Bid Due: 12/08/2026
...TDCJ - Water Treatment Plant for Memorial Follow Solicitation Solicitation ID: 696-FD-26-Q051... Last ...
State Government of Texas
Bid Due: 11/23/2026
...Bid Information Type RFP Status Issued Number 27/004LT (Water Treatment Chemicals, Supplies... Request ...
County of Harris - Department of Education
Bid Due: 12/09/2026
...RFQS 6100 CLMP401 A View Details Due Date: 12/15/2026 at 2PM Davis Water ...
City of Austin
Bid Due: 12/15/2026