| Location: | North Carolina |
|---|---|
| Posted: | Aug 6, 2026 |
| Due: | Aug 14, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY27-ITBCon-13 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Collective Storm Drainage Improvement Project Series W will include 2 separate projects with this series. 10208 and 10209 Crestwood Drive will include 207 linear feet of new 48" RCP that will connect an existing upstream creek channel to Providence Lake. The 48" RCP installation will be approximately 7-14 feet deep and foundation protection approved by a professional engineer is anticipated. 10208 and 10209 Crestwood Drive anticipates foundation protection at 10201 and 10209 Crestwood Drive. 7211 Quail Meadow Lane will include 717 linear feet of new 42" RCP, 60 linear feet of new 38" x 60" elliptical RCP, and 19 linear feet of new 15" RCP. The new storm pipe system will run along Quail Meadow Lane and outlet on Quail Hollow Homeowners Association Inc. property. The estimated cost of the project is $ 2,919,421.

With GovernmentContracts, you can:
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE 970023_970023014....tif_08011940_plans.pdf Doc. Type: Letting Support ...
Division of Highways
Bid Due: 9/08/2026
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE BR0150_Final Plans- Signed.pdf Doc.... Type: ...
Division of Highways
Bid Due: 9/08/2026
...ITB - Sessoms Street Drainage Improvements Reference number: COF1517023 Closing date October 01..., ...
City of Fayetteville
Bid Due: 10/01/2026
...DF00569 POC Grading, Drainage & Signals - NC 82-217 & US 421 - ...
Division of Highways
Bid Due: 9/02/2026