| Location: | Texas |
|---|---|
| Posted: | Jun 5, 2025 |
| Due: | Jun 26, 2025 |
| Agency: | City of Austin |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 6100 CLMC1095A-REBID |
| Publication URL: | To access bid details, please log in. |
| Type: |
Invitation For Bids (IFB) |
| Status: | Open |
| Solicitation Number: | IFB 6100 CLMC1095A-REBID |
| Description: | Reconfigure Planning and Development Building - REBID |
| Summary: | Project entails Reconfiguration of existing Planning and Development Building to have collaboration space needed for designers, planners, contractors and staff to coordinate, communicate and implement AUS’s Airport Expansion and Development Program (AEDP) capital program for efficient use of space and extend life of assets. Major scope of work relates to HVAC replacement and fire suppression system (sprinkler) installation and interior demolition for open office workspace environment. Minor site work related to bringing fire line connection from fire hydrant into building and fire riser room as part of interior space reconfiguration. |
| Estimated Amount for Solicitation: |
$4,999,999.00 |
| African American | 1.31% |
| Hispanic American | 2.25% |
| Native/Asian American | 0.59% |
| WBE | 1.04% |
| Authorized Contact Names: | |
| Project Related Questions: |
Paul Sanchez (512) 530-2457 paul.sanchez@flyaustin.com |
|
Solicitation Specific
Questions: |
Jermaine Anderson (512) 974-7096 jermaine.anderson@austintexas.gov |
|
Small Minority Business
Resources Questions: |
Johnathan Williams (512) 974-1295 smbrcompliancedocuments@austintexas.gov |
| Important Solicitation Dates: | |
|
Solicitation Published: |
06/05/2025 07:20 AM |
|
Response Due: |
Prior to 06/26/2025, 02:00 PM |
|
Compliance Plan Due: |
Prior to 06/26/2025 02:00 PM Required |
|
Response Opening: |
06/26/2025, 03:00 PM |
| Special Notes: |
Compliance Plan Required. |
Listed below are the various documents that have been issued as part of this Solicitation. Each document contains specific information about the solicitation. We recommend that you view and/or download each document before preparing your response to the solicitation, and that you use the bid subscription link to record your interest in this solicitation.
| File Description | Type | Date | |
| Bid Documents | 06/05/2025 | Download | |
| MBE/WBE/DBE Procurement Packet | 06/05/2025 | Download | |
| Plans/Drawings | 06/05/2025 | Download |
| Description | Code |
| Building Construction, Non-Residential (Office Bldg, etc) | 90922 |
| Description | Category | Code |
| Building Construction, Non-Residential (Office Bldg, Etc) | Construction | 90922 |
| Doors And Windows | Construction | 90937 |
| Finishes: Flooring, Wall And Ceiling, Etc. | Construction | 90945 |
| Site Work | Construction | 90976 |
| Demolition Services | Construction | 91240 |
| Carpentry | Construction | 91427 |
| Concrete | Construction | 91430 |
| Electrical | Construction | 91438 |
| Heating, Ventilating And Air Conditioning (Hvac) | Construction | 91450 |
| Masonry | Construction | 91455 |
| Metal Work | Construction | 91458 |
| Painting | Construction | 91461 |
| Plumbing | Construction | 91468 |
| Fire Protection Equipment And Systems Including Fi | Non-professional | 93633 |
| Inspection Services, Construction Type | Non-professional | 96847 |

With GovernmentContracts, you can:
...Fire Suppression System Services for Student Nutrition (SNS)A Document Type Bid Sourcing Number... ...
Garland Independent School District
Bid Due: 6/11/2026
.... The facility is intended to function as a combined public safety facility ...
City of Krum
Bid Due: 6/23/2026
...as a combined public safety facility housing fire suppression, EMS support operations, law ...
City of Krum
Bid Due: 6/23/2026
...distribution and fire alarm and suppression systems, ceilings, windows, doors, floor coverings, interior... ...
DEPT OF DEFENSE
Bid Due: 6/10/2026