| Location: | California |
|---|---|
| Posted: | Oct 20, 2026 |
| Due: | Oct 27, 2026 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | SLAC_RFP_368509 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released.
Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist.
SLAC CUIR SP1 MASTER SUBSTATION ANNEX BUILDING CONSTRUCTION
DESCRIPTION
This is a Sources Sought Notice to identify general contractors capable of building the planned Master Substation Annex Building work under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.
BACKGROUND
Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These original utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs.
CUIR is a project directly funded by the DOE's Office of Science. The project is organized into three subprojects to efficiently execute utility improvements in alignment with lab priorities and operational downtime schedules.
PLANNED SCOPE AND DESCRIPTION OF SERVICES
The project involves work inside the SLAC Master Substation Yard, adjacent to an existing Building B016 which serves as the control center for SLAC electrical power systems. Scopes under this contract includes:
As the existing Building B016 s must remain functional throughout construction, the work must be carefully planned and coordinated to protect existing systems, maintain laboratory operations, and minimize electrical service interruptions.
DRAFT REQUEST FOR PROPOSAL
The Master Substation Annex Building has an estimated cost range of $12M to $17M. SLAC will use a Best Value Trade Off selection method to identify the most qualified design-build subcontractor. The draft Request for Proposal and relevant references are provided to present the general scope and acquisition method for the project. The draft documents provided are subject to change and should not be construed as a solicitation. This Sources Sought Notice is NOT A SOLICITATION, but instead is to identify interested vendors for the upcoming formal solicitation release.
SOURCES SOUGHT RESPONSE
Interested contractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought Notice. Interested Vendors should express their interest on the Interested Vendors List through this SAM.gov posting, or by emailing the Primary Point of Contact. Please provide the following information via email:
Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PDT on October 26, 2026.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.

With GovernmentContracts, you can:
...the safe, reliable, and uninterrupted operation of Water Authority electrical systems and infrastructure...) ...
San Diego County Water Authority
Bid Due: 12/31/2026
...construction & maintenance services - Electrical system services - Electrical inspection service 81141805... ...
State Government of California
Bid Due: 11/06/2026
...specialists for authorized medium-voltage, generator electrical, and control-system work. Services..., and materials to ...
City of Palo Alto
Bid Due: 11/19/2026
...Evaluators (IEs) qualified to review and assess electrical corporation implementation... of their approved ...
State Government of California
Bid Due: 11/02/2026