| Location: | California |
|---|---|
| Posted: | Nov 18, 2024 |
| Due: | Dec 5, 2024 |
| Agency: | Sierra College |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The Project includes modernization and seismic rehabilitation of (2) two existing lab buildings (H & N) on the Sierra College Rocklin campus. The structural modification will include new attached additions, new shear walls, new steel braced frames, retrofit of existing steel and concrete seismic connections, new openings in existing concrete walls. Interior renovations include renovations of partition walls, slab on grade replacement at new utilities, equipment anchorage. Also includes a new covered walkway canopy, and masonry site walls. Funding for the Project is from a combination of State funding and local District funding. The construction budget for the Project is $40,500,000. This amount includes all costs including planning, construction, supervision, management, compliance with all applicable codes and agency requirements, and any and all items required for the completion of the Project per the Contract Documents.

With GovernmentContracts, you can:
...structural excavation, form work and cast in place scope complete. Work also includes ...
UCLA Capital Programs
Bid Due: 8/07/2026
...and structural steel, roofing system with insulation and drainage, MEP, fire protection, installation...
Ventura County
Bid Due: 7/28/2026
...Contractors Construction 238120: Structural Steel and Precast Concrete Contractors Construction 238210...
City of Los Angeles
Bid Due: 8/26/2026
...331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel Manufacturing 331318: ...
City of Los Angeles
Bid Due: 6/30/2031