| Location: | Florida |
|---|---|
| Posted: | Jan 8, 2025 |
| Due: | Jan 29, 2025 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-11364 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 70171705 | Pipelines maintenance or management services |
| 70171800 | Drainage services |
| 70171801 | Land drainage services |
| 70171802 | Storm water drainage |
| 71121118 | Pipeline or flow line laying services |
| 71121119 | Pipeline intervention services |
| 71122207 | Slickline pipe recovery services |
| 71131410 | Pipeline cleaning services |
| 71131411 | Pipeline flow enhancement services |
| 71131415 | Pipeline flow assurance services |
| 72141107 | Bridge construction and repair service |
| 72141124 | Pipe laying service |
| 72141126 | Underground utilities construction service |
| 72141129 | Park and garden construction and or remodelling service |
| 72141200 | Marine construction services |
| 72141205 | Drainage system construction service |
| 72141510 | Demolition services |
| 72152700 | Concrete installation and repair services |
| 72152902 | Concrete reinforcement placing service |
| 72154012 | Concrete forms erection and dismantling service |
| 78102100 | Pipeline services |
| 78102103 | Pipeline inline inspection service |
| 95121621 | Seawall |
January 8, 2025
NOTICE TO APPLICANTS
ADDENDUM NO. ONE (1)
Hugh Taylor Birch State Park - Culvert 2 Rehab & Seawall
DEP BID NO. BDC33-24/25
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
_______________________________________
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
Answer: CIPP lining will not work since the existing culvert is potentially collapsed.
Answer: We don’t want to reduce the capacity of the existing culvert.
Answer: Not that I am aware of.
Answer: There are historic reports of the seawall and per the reports it has exceeded its life expectancy. Thus, the replacement does not go all the way to the existing seawall and does not expose the existing seawall.
Answer: See the response to comment #4.
Answer: Replacement of the existing 48” CMP through the wall will occur when the seawall, in the future, is repaired or replaced.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
Please direct all questions to:| Description | Date/Time |
| Addendum #1 BDC33 24-25 - Hugh Taylor - Culvert 2 Rehab & Seawall | Jan 9, 2025, 3:18:43 AM |

With GovernmentContracts, you can:
..., but are not limited to: Assessment of KUA's existing network, data, and ...
Kissimmee Utility Authority
Bid Due: 6/12/2026
...and provide survivability assurance. The threat model must provide real-time operator interaction..., be ...
DEPT OF DEFENSE
Bid Due: 6/15/2026