| Location: | Texas |
|---|---|
| Posted: | Oct 8, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26008 |
| Publication URL: | To access bid details, please log in. |
26008
Posted
Brandi Whittenton
(979) 764-3814
bwhittenton@cstx.gov
10/29/2025
2:00 PM
M0210
14+ Days for Entire Solicitation Package
10/8/2025
10/8/2025 10:28 am
91100-CONSTRUCTION AND UTILITIES, HIGHER EDUCATION;
91350-Construction, Street (Major And Residential)(Includes Reconstruction);
91396-Paving/Resurfacing, Street (Major And Residential);
This project consists of the rehabilitation and reconstruction of Marion Pugh
Drive from George Bush Drive to Holleman Drive. The roadway rehabilitation project will generally
include removal of existing asphalt pavement, constructing 10” jointed reinforced concrete pavement
with curbs including subgrade, constructing a storm sewer system, water line system, and sanitary
sewer work. Installing striping and signage, TCP, SW3P, block-sodding disturbed areas, and all other
related work associated to the project as shown on the plans and specifications.

With GovernmentContracts, you can:
...Project: PW - CPN 102787 - Water and Sanitary Sewer Rehabilitation Contract 116 ...
City of Fort Worth
Bid Due: 7/02/2026
...Project: PW - CPN 100997-1 - Sanitary Sewer M-245 Parallel Relief Pipeline Part ...
City of Fort Worth
Bid Due: 7/16/2026
...Project: PW - CPN 103417 - Water and Sanitary Sewer Replacements Contract 2019, ...
City of Fort Worth
Bid Due: 6/25/2026
...Addendum 1 - 2 Bid Form 2 Northridge Addition Sanitary Sewer Replacement by ...
City of Mesquite
Bid Due: 12/21/2089