| Location: | Texas |
|---|---|
| Posted: | Oct 8, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26008 |
| Publication URL: | To access bid details, please log in. |
26008
Posted
Brandi Whittenton
(979) 764-3814
bwhittenton@cstx.gov
10/29/2025
2:00 PM
M0210
14+ Days for Entire Solicitation Package
10/8/2025
10/8/2025 10:28 am
91100-CONSTRUCTION AND UTILITIES, HIGHER EDUCATION;
91350-Construction, Street (Major And Residential)(Includes Reconstruction);
91396-Paving/Resurfacing, Street (Major And Residential);
This project consists of the rehabilitation and reconstruction of Marion Pugh
Drive from George Bush Drive to Holleman Drive. The roadway rehabilitation project will generally
include removal of existing asphalt pavement, constructing 10” jointed reinforced concrete pavement
with curbs including subgrade, constructing a storm sewer system, water line system, and sanitary
sewer work. Installing striping and signage, TCP, SW3P, block-sodding disturbed areas, and all other
related work associated to the project as shown on the plans and specifications.

With GovernmentContracts, you can:
...and 2' earthen shoulders. A new 48-inch storm sewer outfall will be constructed ...
Brazoria County
Bid Due: 7/31/2026
...Posting Date: 7/28/2026 Last Modified: 7/28/2026 6:22 pm Class/Item Code: 91345-Construction, Sewer And... ...
State Government of Texas
Bid Due: 8/25/2026
...; 91327-Construction, Highway And Road; 91345-Construction, Sewer And Storm Drain; 91350-Construction...
State Government of Texas
Bid Due: 8/18/2026