| Location: | Federal |
|---|---|
| Posted: | Mar 25, 2025 |
| Due: | Apr 23, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z02325R93250001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
A00004-
The US Coast Guard has received communication from multiple sources regarding the SPC-HWX II engine requirements. Indications are meeting all the requirements may not be possible in the current market. Areas that have been commented on:
The US Coast Guard is adjusting the requirements to improve the likelihood of receiving proposals that meet the minimum requirements.
Engine Emissions Requirements:
At proposal submission, all engines (propulsion and generators) must have a two-year / 500-hour proven track record in the marine service in accordance with Spec 200-2.3. This serves as an indicator of reliability and maturity of the engines. Specification section 233-2 has been revised to provide allowance for impacts to EPA certificates necessitated by modification to meet the unique SPC-HWX II requirements.
If modifications to the proposed engine are necessary to meet the inversion or high heel angle operational requirements, describe the modification effects on EPA certificate(s) and provide a plan to ultimately recertify the engines if necessary. Design reviews will be used to refine this plan and establish the final configuration and certification status of the engines.
High Heel Angle operation (65-110 degrees):
The intent is to ensure crews have sufficient power to safely maneuver in high heel-angle situations. Power must be available up to 110 degrees at which point the engine should drop to idle after 2.0 seconds in accordance with Spec 200-4.1. The specification has been updated to allow limiting engine output in high heel angle operations (i.e. 65 to 110 degrees) provided sufficient power remains available to operate the boat up to the 110-degree idle cutoff. The propulsion system may be restricted in performance while at these high heel angles without limiting the crew’s ability to manipulate the throttle controls. Design reviews will be used to discuss and refine high heel angle performance.
Proposal Due Date:
Due date has been updated to 23 APR 2025.
Attachments:
SF30 - SPC-HWX II - A00004
Attachment 1 - SPC-HWX II - SPEC - A00004
Attachment 8 - SPC-HWX II - Government Responses - A00004
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
A00003-
This amendment addresses questions that we have received to date. Attachment 8 SPC-HWX II Questions and
Clarifications Form - Government Responses - A00003, Attachment 1 - SPEC - A00003, Attachment 2 - SOW - A00003,
Attachment 3 - Price Schedule - A00003 and an updated RFP 70Z02325R93250001 - A00003 have been published.
Attachments:
RFP 70Z02325R93250001 - A00003
SF30 - SPC-HWX II - A00003
Attachment 1 - SPC-HWX II - SPEC - A00003
Attachment 2 - SPC-HWX II - SOW - A00003
Attachment 3 - SPC-HWX II - Price Schedule - A00003
Attachment 8 - SPC-HWX II - Government Responses - A00003
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
A00002-
This amendment addresses questions that we have received to date. You can find the Government Responses on Attachment 8 - SPC-HWX II - Government Responses - A00002.
Attachments:
SF30 - SPC-HWX II - A00002 - 1-27-2025
Attachment 8 - SPC-HWX II - Government Responses - A00002
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
A00001-
The following changes have been updated to the RFP:
1. Attachment 3 - Price Schedule - A00001 has been updated; and
2. SF1449, Part III Addendum 52.212-4, Section 9 Contract Financing has been updated.
From the following changes, the following attachments have been uploaded and changed.
Attachments:
SF1449 - 70Z02325R93250001 - A00001 - 1-13-2025
SF30 - SPC-HWX II - A00001 - 1-13-2025
Attachment 3 - SPC-HWX II Price Schedule - A00001
Attachment 8 - SPC-HWX II - Government Responses - A00001
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
The U.S. Coast Guard (USCG) has a requirement to provide the next generation of the Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II).
| Dec 10, 2024 | [Combined Synopsis/Solicitation (Original)] Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II) |
| Jan 13, 2025 | [Combined Synopsis/Solicitation (Updated)] Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II) |
| Jan 27, 2025 | [Combined Synopsis/Solicitation (Updated)] Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II) |
| Feb 21, 2025 | [Combined Synopsis/Solicitation (Updated)] Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II) |
| Apr 7, 2025 | [Combined Synopsis/Solicitation (Updated)] Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II) |

With GovernmentContracts, you can:
...Attachments for FA2280-23-S-C001 CSO and FA2280-23-S-C001 003 UAS Power Generation Challenge Updated.... Updated ...
Federal Agency
Bid Due: 2/23/2028
...SCPPA RFI - LADWP Power System Project and Asset Management Platform SCPPA LADWP ...
southern california public power authority
Bid Due: 6/17/2026
...for FA2280-23-S-C001-003 UAS Power Generation Challenge Updated attachment "06.01.2023 UAS Power... Generation Challenge" ...
DEPT OF DEFENSE
Bid Due: 2/23/2028
...-S-C001-003 UAS Power Generation Challenge Updated attachment "06.01.2023 UAS Power Generation... Challenge" supersedes ...
DEPT OF DEFENSE
Bid Due: 2/23/2028