| Location: | Texas |
|---|---|
| Posted: | Apr 28, 2026 |
| Due: | May 12, 2026 |
| Agency: | City of Kyle |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: FM 1626 Transmission Main Pipeline REBID
Addenda: 1
Release Date: 4/28/2026
Due Date: 5/12/2026
The Work consists of the installation of approximately 1.2 miles (6,300 LF) of 30-inch and 24-inch PVC pipe extending between the City’s FM1626 Pump Station site to the Well 4 Site along TXDOT and City right-of-way. Additionally, the Work includes a 16-inch and 12-inch PVC pipe across Benner Rd. to connect the Well 4 Site to the City’s water distribution system. Work will also include the installation of all necessary valving along the transmission line and several trenchless crossings under roadways.

With GovernmentContracts, you can:
...Project: Ductile Iron Pipe Ref. #: BG26-00030409 Type: RFB Status: Open Open Date: ...
City of Dallas
Bid Due: 6/12/2026
...Project: Ductile Iron Pipe Ref. #: BG26-00030409 Type: RFB Status: Open Open Date: ...
City of Dallas
Bid Due: 6/12/2026
...Pipe Repair and Site Restoration ITB City of College Station 5/22/2026 6/8/2026 02:00:00 ...
County of Brazos
Bid Due: 6/08/2026
...Pipe Repair and Site Restoration ITB City of College Station 5/22/2026 6/8/2026 02:00:00 ...
City of College Station
Bid Due: 6/08/2026