| Location: | Texas |
|---|---|
| Posted: | Apr 28, 2026 |
| Due: | May 12, 2026 |
| Agency: | City of Kyle |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: FM 1626 Transmission Main Pipeline REBID
Addenda: 1
Release Date: 4/28/2026
Due Date: 5/12/2026
The Work consists of the installation of approximately 1.2 miles (6,300 LF) of 30-inch and 24-inch PVC pipe extending between the City’s FM1626 Pump Station site to the Well 4 Site along TXDOT and City right-of-way. Additionally, the Work includes a 16-inch and 12-inch PVC pipe across Benner Rd. to connect the Well 4 Site to the City’s water distribution system. Work will also include the installation of all necessary valving along the transmission line and several trenchless crossings under roadways.

With GovernmentContracts, you can:
...Project: 48" WATER TRANSMISSION MAIN RELOCATION PROJECT AND WATER AND WASTEWATER MAIN REPLACEMENTS... ...
City of Dallas
Bid Due: 6/26/2026
...Project: 48" WATER TRANSMISSION MAIN RELOCATION PROJECT AND WATER AND WASTEWATER MAIN REPLACEMENTS... ...
City of Dallas
Bid Due: 6/26/2026
...Project: 48" WATER TRANSMISSION MAIN RELOCATION PROJECT AND WATER AND WASTEWATER MAIN REPLACEMENTS... ...
City of Dallas
Bid Due: 6/26/2026
...Project: 48" WATER TRANSMISSION MAIN RELOCATION PROJECT AND WATER AND WASTEWATER MAIN REPLACEMENTS... ...
City of Dallas
Bid Due: 6/26/2026