| Location: | North Carolina |
|---|---|
| Posted: | Oct 8, 2025 |
| Due: | Nov 5, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES-2024-03 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES-2024-03 |
| Project Title: | Group 8 Sidewalks and Roadway Improvements |
| Description: | The Project is spread over 2 locations, and each of them generally consists of the major items as follows: Colleton Road: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of concrete curb & gutter, concrete sidewalk, concrete curb ramps, driveways aprons, utilities relocation, tree removal, erosion and traffic control, and setting up detour, and other pertinent items, including seeding and restoration. Garner Road: Furnishing all labor, materials, equipment and performing all work necessary and incidental to the grading and installation of concrete sidewalk, concrete curb ramps, asphalt multi-use path, monolithic concrete islands, pedestrian and traffic signals improvements, Signing and pavement markings, utilities relocation, pipe removal, tree removal, erosion and traffic control and setting up detour, and other pertinent items including seeding and restoration. |
| Opening Date: | 11/5/2025 10:00 AM |
| Posted Date: | 10/9/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-2024-03
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-11-05T10:00:00.0000000
|
Posted Date
*
2025-10-08T20:47:13.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Stephane Belinga Stephane.belinga@raleighnc.gov,
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The Project is spread over 2 locations, and each of them generally consists of the major items as follows: Colleton Road: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of concrete curb & gutter, concrete sidewalk, concrete curb ramps, driveways aprons, utilities relocation, tree removal, erosion and traffic control, and setting up detour, and other pertinent items, including seeding and restoration. Garner Road: Furnishing all labor, materials, equipment and performing all work necessary and incidental to the grading and installation of concrete sidewalk, concrete curb ramps, asphalt multi-use path, monolithic concrete islands, pedestrian and traffic signals improvements, Signing and pavement markings, utilities relocation, pipe removal, tree removal, erosion and traffic control and setting up detour, and other pertinent items including seeding and restoration.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...DB00645 POC GRADING, DRAINAGE, AND PAVING OF NC 58 AT SR 1259 (TAYLOR ...
Division of Highways
Bid Due: 9/23/2026
...line is also included as an optional bid item. Should the contractor have ...
State Government of North Carolina
Bid Due: 9/23/2026
...necessary materials, labor , and equipment for the construction of a parking lot ...
Division of Highways
Bid Due: 9/23/2026
.... THE PROJECT GENERALLY CONSISTS OF the furnishing of all materials, labor and ...
Division of Highways
Bid Due: 9/24/2026