| Location: | North Carolina |
|---|---|
| Posted: | Oct 8, 2025 |
| Due: | Nov 5, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES-2024-03 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES-2024-03 |
| Project Title: | Group 8 Sidewalks and Roadway Improvements |
| Description: | The Project is spread over 2 locations, and each of them generally consists of the major items as follows: Colleton Road: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of concrete curb & gutter, concrete sidewalk, concrete curb ramps, driveways aprons, utilities relocation, tree removal, erosion and traffic control, and setting up detour, and other pertinent items, including seeding and restoration. Garner Road: Furnishing all labor, materials, equipment and performing all work necessary and incidental to the grading and installation of concrete sidewalk, concrete curb ramps, asphalt multi-use path, monolithic concrete islands, pedestrian and traffic signals improvements, Signing and pavement markings, utilities relocation, pipe removal, tree removal, erosion and traffic control and setting up detour, and other pertinent items including seeding and restoration. |
| Opening Date: | 11/5/2025 10:00 AM |
| Posted Date: | 10/9/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-2024-03
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-11-05T10:00:00.0000000
|
Posted Date
*
2025-10-08T20:47:13.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Stephane Belinga Stephane.belinga@raleighnc.gov,
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The Project is spread over 2 locations, and each of them generally consists of the major items as follows: Colleton Road: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of concrete curb & gutter, concrete sidewalk, concrete curb ramps, driveways aprons, utilities relocation, tree removal, erosion and traffic control, and setting up detour, and other pertinent items, including seeding and restoration. Garner Road: Furnishing all labor, materials, equipment and performing all work necessary and incidental to the grading and installation of concrete sidewalk, concrete curb ramps, asphalt multi-use path, monolithic concrete islands, pedestrian and traffic signals improvements, Signing and pavement markings, utilities relocation, pipe removal, tree removal, erosion and traffic control and setting up detour, and other pertinent items including seeding and restoration.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...: Objective: Installation of approximately 40 feet of 8-inch PVC SDR35 Gravity Sewer ...
State Government of North Carolina
Bid Due: 6/10/2026
...GENERALLY CONSISTS OF the complete installation of a 54-inch and 30-inch filter effluent ...
City of Durham
Bid Due: 6/25/2026
...and gutter, installation of approximately 1,055 l.f. of 15" HP storm pipe and ...
State Government of North Carolina
Bid Due: 7/09/2026
...Documents: a. Remove existing bypass connection and piping b. Installation of pigging access/bypass... ...
State Government of North Carolina
Bid Due: 6/23/2026