REQUEST FOR PROPOSAL
500-151
REQUESTOR:
CONTACT:
PROJECT:
DUE:
RETURN TO:
Town of Fort Mill
205 North White Street
Fort Mill, SC 29715
Phillip Aycock, Procurement Manager
803-547-2116 ext. 1169
TOWN OF FORT MILL FIRE DEPARTMENT
STRUCTURAL FIREFIGHTING TURNOUT GEAR RFP 500-151
Sealed Proposals are due by January 7, 2026 at 3:00 pm
TOWN OF FORT MILL
205 NORTH WHITE STREET
FORT MILL, SC 29715
ATTENTION: Phillip Aycock, Procurement Manager
Deadlines for Questions
January 5, 2026 by 5:00 pm
Bid Opening
January 7, 2026 at 3:00 pm
1
Purpose/Scope
The Town of Fort Mill Fire Department would like to obtain options of purchasing multiple sets of
structural turnout gear.
Design Requirements and Specifications
Jacket
• Outer Shell – Gemini XT, Black
• Moisture Barrier – Gore RT 7100, 3D
• Thermal Liner – Quantum 3D SL2i
• Reinforced Padded Elbows
• Standard Thermal Padding in Shoulders and Upper Back
• Nomex hand and Wrist Guards Sewn to the Liner (Standard Assembly)
• Cargo / Handwarmer Pocket with Nomex (Fleece Lined)
• Standard Zipper and Velcro Closure
• Radio Pocket Sewn on Left Chest 3”x3”x9” with Antenna Notch on Left and Right
• Reinforced Radio Pocket (Bottom Only)
• Mic Tab Sewn on 5” Above Radio Pocket
• Mic Tab Sewn on Right Side 1 3/4” Above Flashlight Hook
• Survivor Flashlight Holder Right Chest 1/2” off the Storm Flap
• Small D Ring Sewn 2 ¾ “ off the Flashlight Holder Clip
• Cuff Trim Reinforced
• NYC 3” Lime Triple Trim
• DRD – Drag Rescue Device as Required by NFPA
• “FORT MILL” Sewn Straight Across on Upper Back in 3” Letters
• Hanging Tail Extended Coat with Liner to Match
• Must have 4” Velcro Panel for Name with Velcro to Match on Tail of Coat (3” Letters)
• Must have 4” Velcro Panel for Rank with Velcro to Match above the 2nd Stripe of Triple Trim
(Must have 3” Letters)
• Install Loop on Both Sides of the Coat to Accommodate an Anti Sway Strap a Portable Radio.
Must be Made of Gemini XT Black and Sewn on to the Coat.
Pants
• Outer Shell – Gemini XT, Black
• Moisture Barrier – Gore RT 7100, 3D
• Thermal Liner – Quantum 3D SL2i
• Kevlar Reinforcement on the Inside of the Pockets
• Reinforced Knees
• Reinforced Cuffs
• Reinforcement on the Outside of the Pockets to the Velcro Closure
• Flap on the Right-Side Pocket will be 8” with Full Velcro and a Grab Handle
2
• Full Length Velcro on all Pockets
• Standard Padded Suspenders
• Belt Loops Sewn onto the Pants what will Accommodate the Sterling – Bolt Belt – Escape Belt
• Pocket should be designed for EVAC System EP-439 Bailout System w/o bag
• 3” Triple Trim around Cuffs
• Extra Knee Padding behind Reinforcement
• Full reinforcement on the outside of the pockets.
• Install loop on center rear of the pants to accommodate an Anti-Sway strap for a portable radio.
Must be made of Gemini XT Black and Sewn on to the pants.
Options
• All coats should be +3” in length.
Notes
• Person Must Be Able to Access Pockets on Their Pants Without Lifting Coat.
Town Contact
If you have any questions regarding this RFP or terms or conditions, please contact Chipper Wilkerson,
The Town of Fort Mill Fire Chief at cwilkerson@fortmillsc.gov by January 5, 2026.
Excluded Bidders
Bids from vendors/contractors with prior poor performance; quality issues, contact conformance,
payment history, timeline compliance, or any other reason the Town deems POOR PERFORMANCE will
not be considered. Excluded Vendors/Contractors can resubmit complete company information with
references for Town review after a minimum of one year from the last excluded bid. The Town will
contact Vendor/Contractor with its decision within 30 days of company information submittal. The Town
reserves the right to include or exclude said Vendor/Contractor based on findings.
3
Non-Appropriation of Funds
This Agreement shall be subject to the availability and appropriation of funds by Management, and
Town Council. If the Council does not appropriate the funding needed by the Town to make payments
under this Agreement for a given fiscal year, the Town will not be obligated to pay amounts due beyond
the end of the last fiscal year for which funds were appropriated. No act or omission by the Town, which
is attributable to non-appropriation of funds, shall constitute a breach of or default under this
Agreement.
Cancellation
An Invitation for Bids, a Request for Proposals, a Request for Qualifications, or other solicitation
may be cancelled, or any or all bids or proposals may be rejected in whole or in part as may be
specified in the solicitation, when it is in the best interest of the Town. The reasons therefor shall
be made part of the contract file.
Compliance with Law
The selected consultant and its agents and employees shall be bound and comply with all federal, state
and local laws, ordinance rules and regulations, as well as all other governing bodies having legal
jurisdiction with respect to the area where such work is performed.
Proprietary/Vendor Disclosure – Notice of SC Freedom of Information Act
The parties acknowledge that all material submitted may be subject to release under the South Carolina
Freedom of Information Act (FOIA) and will be released to the public unless exempt from disclosure
under FOIA. We discourage you from including any information you consider proprietary or trade secret,
as this material is subject to the FOIA once it is in the Town’s possession. If you must include such
information in your submission, please identify it by color, labeling, and/or bold font so that it can be
readily identified. In the event the Town receives a request for this material, the Town will notify those
parties who have identified information they believe is proprietary or trade secret of the request. The
Town has a Ten (10-day deadline to produce the material. This is your window to file an action
challenging the release. Please be on notice that if the Town is not served such an action, the
information will be released).
4
Disqualification and Rejection of Quotations
Town of Fort Mill reserves the right to reject any consultant who has failed to perform satisfactorily, or
complete on time, or in a manner consistent with the bid documents, contract of similar nature, or to
reject the RFP of a consultant who is not able to perform such contract satisfactorily. The Town
expressly reserves the right to award the contract to the consultant that best meets the requirements as
set forth herein. This solicitation does not commit the Town of Fort Mill to award a contract, to pay any
cost incurred in the preparation of a proposal, or to produce or contract for services. The Town of Fort
Mill reserves the right to accept or reject any or all proposals received as a result of the Request for
Proposal, or to cancel it in part or in its entirety if it is in the best interest of the Town of Fort Mill.
The Town reserves the right to change the solicitation schedule or issue amendments to the solicitation
at any time.
Pricing Request
Sealed bids will be received by the Procurement Department of the Town of Fort Mill, South Carolina
until 3:00 PM local time on January 7, 2026 at which time they will be publicly opened and read aloud.
All companies submitting bids are welcome to attend, but attendance is not mandatory. The bid
opening will begin promptly at the appointed time located at 205 North White Street, Fort Mill, SC
29715. No bid may be submitted after the bid opening begins. The bids must be in the possession of
the Town of Fort Mill Procurement Manager at the time of the bid opening, and it is the responsibility of
the bidder to ensure that the bid arrives in the correct place on time.
No bid may be withdrawn for a period of sixty (60) calendar days after the bid opening.
Bids may be mailed to The Town of Fort Mill, Attn: Phillip Aycock, P.O. BOX 159, Fort Mill, South
Carolina 29716 or hand delivered to Phillip Aycock, Town of Fort Mill Procurement Manager, 205 North
White Street, prior to the appointed time of the bid opening.
All bids must be in a sealed envelope and marked “SEALED BID; TOWN OF FORT MILL FIRE
DEPARTMENT STRUCTURAL FIREFIGHTING TURNOUT GEAR RFP 500-151, OPEN JANUARY 7, 2026 AT
3:00 PM.”
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.