City of Kirkwood, South Clay Avenue, Raised Intersection at Argonne & Jefferson, Resurfacing, upgrade sidewalks

Location: Missouri
Posted: Sep 23, 2026
Due: Oct 7, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 9/23/26 STP-5502(614) City of Kirkwood, South Clay Avenue, Raised Intersection at Argonne & Jefferson, Resurfacing, upgrade sidewalks Sarah Foan-Noory (314) 822-5851 https://kirkwoodmo.ionwave.net 10/7/26

Attachment Preview

REQUEST FOR QUALIFICATIONS PURPOSE, BACKGROUND, AND SCOPE OF
SERVICES
SECTION 1. PURPOSE AND INTRODUCTION
The Missouri Highways and Transportation Commission have determined that the South Clay
Avenue Resurfacing Project is consistent with the goals of the Surface Transportation Program
and has awarded the City of Kirkwood grant funding for the project. The City of Kirkwood is
requesting Construction Services for Federal Project STP-5502(614) South Clay Avenue
Resurfacing Project located on Clay Avenue from Adams Avenue to Woodbine Avenue.
I. BACKGROUND AND PROJECT DESCRIPTION
The proposed project is a pavement preservation project on S. Clay Ave. from Adams Avenue at
the northern limits to Woodbine Avenue at the south project limit, roughly 0.630 miles. This
project excludes improvements to the concrete pavement between Argonne Drive to Madison
Avenue. The bridge over the UP railroad is located within this exclusion.
A city wide pavement conditions report was completed last in 2015 and updated in 2020. S. Clay
Avenue was given a pavement rating of 57 out of 100. In December 2020, the PASER rating for
the project was developed in compliance with EW Gateway's standards and is included later in this
application. Current PASER rating is 3.5.
The S. Clay Ave project will consist of the following improvements:
*Asphalt Milling and Overlay - (Approximately 3,325 Linear Feet)
*Concrete Curb Repair - Approximately 80% of curbs are anticipated to be replaced.
*Non-ADA Compliant Concrete Curb Ramp Replacements
*Non-ADA Compliant Sidewalk Replacement
*ADA Compliant Crosswalks / Realign Skewed Crosswalks
* RRFB
* Enclosed Storm Sewer System Modifications
*Pavement Marking & Signage Updates
Additionally, raised intersections are proposed for the intersections of S. Clay Ave. and Argonne
Drive, and S. Clay Ave. and W. Jefferson Ave. The raised intersection will create a highly visible
physical indication of a high presence of pedestrians.
The City of Kirkwood previously created conceptual plans for proposed improvements to Argonne
Drive, just east of and connecting to, S. Clay. The intersection of S. Clay and Argonne Drive is
proposed to be updated as part of this application and will include many of the previously planned
upgrades.
Page 1 of 10

City/County: City of Kirkwood (St. Louis County) Route: South Clay Avenue Resurfacing Project
TIP# 7188A-23
Federal Aid No: STP-5502(614)
Location: Clay Avenue from Adams Avenue to Woodbine Avenue
Proposed Improvement: Raised Intersection at Argonne & Jefferson,
Resurfacing, upgrade sidewalks
Length: 0.630 Miles
Approximate Construction Cost: $ 1,543,361
DBE Goal Determination: 0%
Consultant Services Required: See Scope of Services below.
Contact: Name: Sarah Foan-Noory, Director of Procurement Phone: (314) 822-5851
Deadlines: Questions: September 30, 2026 at 5:00pm RFQ: October 7, 2026 at 2:00pm
* Submissions of qualifications will only accepted electronically through the E-Procurement Platform at https://kirkwoodmo.ionwave.net. All questions are to be submitted through the E- Procurement Platform. The Letter of interest should not exceed 5 pages total. A page is defined as 8-1/2 by 11 inches and printed on one side.

The project length is 0.630 miles and the approximate construction cost is $1,543,361. A DBE
goal of 16% has been established by MoDOT for this project. DBE firms must be listed in the
MRCC DBE Directory located on MoDOT's website at www.modot.gov, in order to be counted
as participation towards an established DBE Goal. We encourage DBE firms to submit letters of
interest as prime consultants for any project they feel can be managed by their firm. It is required
that your firm be prequalified with MoDOT and listed in MoDOT's Approved Consultant
Prequalification List, or your firm will be considered non-responsive.
City/County: City of Kirkwood (St. Louis County) Route: South Clay Avenue Resurfacing
Project
TIP# 7188A-23
Federal Aid No: STP-5502(614)
Location: Clay Avenue from Adams Avenue to Woodbine Avenue
Proposed Improvement: Raised Intersection at Argonne & Jefferson,
Resurfacing, upgrade sidewalks
Length: 0.630 Miles
Approximate Construction Cost: $ 1,543,361
DBE Goal Determination: 0%
Consultant Services Required: See Scope of Services below.
Contact: Name: Sarah Foan-Noory, Director of Procurement
Phone: (314) 822-5851
Deadlines: Questions: September 30, 2026 at 5:00pm
RFQ: October 7, 2026 at 2:00pm
* Submissions of qualifications will only accepted electronically through the E-Procurement
Platform at https://kirkwoodmo.ionwave.net. All questions are to be submitted through the
E- Procurement Platform. The Letter of interest should not exceed 5 pages total. A page is
defined as 8-1/2 by 11 inches and printed on one side.
SECTION 2. SUBMITTAL REQUIREMENTS
Discuss the qualifications of your firm's project team and its ability to provide professional
services as presented in Section 3. Particularly discuss the following elements.
A. General Consultant Information
List the general information of your Firm including name, mailing address, location, phone
number, fax number and email address of firm/person submitting the proposal.
B. Related Experience and Past Performance of Firm
Indicate the related and special experience of your Firm within the past five years, in
conducting services of similar scope and magnitude, with the City of Kirkwood and other
Page 2 of 10

agencies. Include the name of the client and project, location, scope of work and services
provided, date completed, and contact, including telephone number. Emphasize the
specialties and strengths of your firm. Also, discuss the firm's ability and experience
studying and evaluating signalized intersections and mid-block crossings for a safe design,
appropriate signal timing and appropriate traffic control devices.
C. Personnel Availability and Work Load
List a Brief resume of each key person(s) and/or specialist(s) to be assigned to these
projects and indicate your Firm's current work load and availability of personnel to
complete projects in a timely and professional manner. Include the number of employees
available in your Firm, classified by their field(s) of experience.
D. Proposed Sub-Consultants, Joint Ventures or Partnership Agreements
Identify any sub-consultants you may use to augment your efforts. Include their personnel
qualifications, experience and anticipated tasks.
SECTION 3. SCOPE OF SERVICES
The City of Kirkwood is requesting qualifications for the consulting services for Preliminary
Engineering and Construction Engineering that may include but are not limited to the following
services in accordance with LPA Manual section 136.11. The descriptions of the requested services
are not all inclusive of the tasks required:
Construction Engineering
1. Conduct a preconstruction conference to discuss project details with the Contractor, City,
and Utilities.
2. Perform Pre-construction digital color photos and video of features shall include, but not
be limited to, residential and commercial entrances, sidewalks, outside of houses (front
and sides), retaining walls, fences, steps, traffic signals, and landscaping. Photos and
videos will be labeled with project name, direction and road name, time and dated. The
finished product shall be a bright, sharp, clear picture free of distortion and show
sufficient detail acceptable to the City.
3. Perform site visits to observe and document the Contractor's progress and quality of
work, and to determine if the work conforms to the contract documents. It is anticipated
that survey staking and layout will be accomplished by the contractor's forces. The
Consultant will accompany MoDOT and FHWA representatives on visits of the project
site as requested.
4. Check shop drawing submittals and review schedules and drawings submitted by the
Contractor.
5. Reject work not conforming to the project documents. Immediately bring to the attention
of the City, failure by the Contractor to comply with a plan or specification requirement,
any problem, trends toward borderline compliance, or any other occurrence, which may
Page 3 of 10

while land is disturbed in the project. Document the erosion control
inspections and inform the contractor of any deficiencies. Perform follow up inspections
to ensure deficiencies are addressed promptly by Contractor.
Perform monthly status update meeting with the City and contractor

be of interest to the City as well as all situations incapable of disposition in the field.
He/she will also be available to attend conferences for the disposition of such matters
when so requested by the City.
6. Prepare change orders for issuance by the City as necessary and ensure that proper
approvals are made prior to work being performed.
7. Conduct a pre-paving conference to discuss paving and traffic control details with the
Contractor.
8. Review payrolls; perform wage rate and Commercially Useful Function interviews,
review on-site bulletin board postings, equal employment opportunity and other related
items called for in the contract documents.
9. Materials Testing and Acceptance. Perform and review material tests in accordance with
the Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing
(FAST) table in the LPA Manual and as provided in the Job Special Provisions, review
material certifications furnished by Contractor, and arrange for field and laboratory
testing of samples. Approve and reject materials and their placement as needed.
10. Maintain progress diary and other project records, measure and document quantities,
document traffic control, and prepare monthly estimates for payments due the Contractor.
11. Be present during critical construction operations, including but not limited to the
following:
a. concrete delivery, placing, and finishing
b. curb ramp and ADA facility forming
c. work affecting existing utilities
d. subgrade and base preparation
e. asphaltic concrete placement
f. signal and sign work
g. striping
12. Perform erosion control inspections following any runoff events and at a minimum once
every 7 days while land is disturbed in the project. Document the erosion control
inspections and inform the contractor of any deficiencies. Perform follow up inspections
to ensure deficiencies are addressed promptly by Contractor.
13. Perform monthly status update meeting with the City and contractor
14. Prepare Substantial Completion letter with semi-final inspection punch-list items
included.
15. Participate in semi and final inspections, provide the City with project documentation
(diaries, test results, measurements, certifications, etc.), and provide as-built plans (in
AutoCAD(R) and Adobe(R) formats) for MSD and the City's records.
16. Submit monthly reimbursement requests to the Missouri Department of Transportation
for construction services paid in full by the City.
The anticipated project schedule includes accelerated consultant selection and negotiation
phases. Firms unable to meet these deadlines should not submit a Qualifications Statement.
The anticipated schedule is as follows:
Page 4 of 10

Project Manager has appropriate qualifications and has successfully managed similar o
projects (10 points)
Technical Leads have appropriate qualifications and have successfully performed on similar o
projects (10 points)
Plan for sub-consultants to contribute meaningfully to this project (10 points) o
Statements concerning Project Team availability appear realistic (10 points) o
Proposed project approach demonstrates a thorough understanding of the City's needs. (25 o
points)
Consultant states they will prepare plans natively in AutoCAD(R) (5 points) o
Prior projects presented are representative of the technical challenges of the project being o
solicited (15 points)
Prior projects include federal-aid projects for Missouri Local Public Agencies (15 points) o

Qualifications Statements Due: October 7, 2026
Negotiation: October 14, 2026
Council Authorization/Contract Execution: November 2026
Estimated Notice to Proceed Date: December 2026
SECTION 4. SUBMISSION OF QUALIFICATIONS
Submissions of qualifications will only accepted electronically through the E-Procurement
Platform at https://kirkwoodmo.ionwave.net by 2:00 p.m. local time on October 7, 2026.
Qualifications submitted after this date and time will not be eligible for consideration.
SECTION 5. EVALUATION CRITERIA
Pursuant to the Brooks Act (40 USC 1102, 23 CFR 172.3) for Consultant Selection - the following
criteria will be the basis for selection.
Experience and Technical Competence - 30 Max Points
Project Manager has appropriate qualifications and has successfully managed similar
o
projects (10 points)
Technical Leads have appropriate qualifications and have successfully performed on similar
o
projects (10 points)
Plan for sub-consultants to contribute meaningfully to this project (10 points)
o
Project Approach - 40 Max Points
Statements concerning Project Team availability appear realistic (10 points)
o
Proposed project approach demonstrates a thorough understanding of the City's needs. (25
o
points)
Consultant states they will prepare plans natively in AutoCAD(R) (5 points)
o
Past Record of Performance - 30 Max Points
Prior projects presented are representative of the technical challenges of the project being
o
solicited (15 points)
Prior projects include federal-aid projects for Missouri Local Public Agencies (15 points)
o
SECTION 6. MISCELLANEOUS
1. Incurring Costs
This Request for Qualifications does not commit the City to award a Contract or to pay for any
cost incurred by successful or unsuccessful submittal in the preparation for this request.
2. Confidentiality
Page 5 of 10

The City shall follow the Missouri Sunshine Law, section 610, therefore all documentation,
proposals, bids, contracts and other documentation submitted to the City in response to this
Request for Proposal is subject to this law. In the event any Firm submitting a proposal shall
include any information deemed "proprietary or confidential" such information shall be clearly
marked. The City as a public entity cannot and does not warrant that information will not be
disclosed.
3. Logo
The City's logo is trademarked and should not be used in responding to this proposal.
4. Conflict of Interest
Firm will disclose all business interests or family relationships with any city officer or
employee who was, is, or will be involved in Firm's selection, negotiation, drafting, signing,
administration, or evaluating Firm's performance. As used in this section, the term "Firm"
shall include any employee of Firm who was, is, or will be involved in the negotiation, drafting,
signing, administration, or performance of the Agreement. As used in this section, the term
"family relationship" refers to the following: spouse or domestic partner; any dependent parent,
parent-in-law, child, son-in-law, or daughter-in-law; or any parent, parent-in-law, sibling,
uncle, aunt, cousin, niece or nephew residing in the household of a civic leader, elected official,
city officer or employee described above.
Through submittal Firm certifies, to the best of their knowledge, that they have no conflict of
interest regarding provision of the services as detailed herein. Firm will inform the City if a
potential conflict of interest arises during the period in which services are rendered.
5. Non-Discrimination
The Firm shall not discriminate against any employee or applicant for employment because of
race, color, religion, sex, national origin, or disability. Such action shall include, but not be
limited to, the following: employment, upgrading, demotion, or transfer; recruitment;
advertising; layoff or termination; rates of pay or other forms of compensation; and selection
of training, including apprenticeship. Firm shall state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, national origin, or
disability. Firm shall incorporate the foregoing requirements of this paragraph in all of its
subcontracts for work performed under the terms and conditions of this anticipated contract.
A breach of this provision may be grounds for Contract termination.
6. Governing Law
Page 6 of 10

Firm shall at all times observe and comply with all Federal and State laws, all local laws,
ordinances, and regulations existing at the time of or enacted subsequent to the execution of
the contract which, if in any manner, affect the prosecution of the work. Firm shall indemnify
and save harmless the City and all of its representatives, and employees against any claim or
liability arising from or based on the violation of any such law, ordinance, regulation, order,
or decree, whether by himself, his employees, or his sub-contractors.
7. City to be Indemnified and Held Harmless
The anticipated contract shall require that Firm covenants and agrees to release the City and
any municipal partners from any and all liabilities of any kind or nature in which the right,
cause of action or claim of any kind or nature whatsoever may hereafter accrue to Firm, its
employees or agents, by virtue of the anticipated contract between Firm and the City. Firm
further covenants and agrees to indemnify and hold the City harmless from any and all claims,
rights or causes of actions or damages of every kind and nature whatsoever which may arise
as a result of the anticipated contract between the City and Firm and Firm shall defend or pay
the cost of defense of the City arising by virtue of any claim or cause of action for damages.
Firm agrees to pay any and all amounts which the City may be required to pay for damages or
amounts which the City may be required to pay for damages or compensation connected with
any claim arising by virtue of the anticipated contract between Firm and the City.
8. Firm's Declaration
Firm will not be permitted to use, to its advantage, any omission or error in the Request for
Proposal, the specifications, requirements, or the contract documents and the City reserves the
right to issue new instructions for such error or omission if originally specified. Through
submittal Firm states that they have examined the information and conditions surrounding the
operation of the service contemplated by the Proposal, and is familiar with the requirements as
to equipment, supplies and labor of such undertaking; and that Firm has carefully prepared,
examined and checked the Proposal to ascertain that no mistake or error is contained the
Proposal; and that Firm will make no claim for correction or modification after the closing
time for the receipt of the proposals.
9. Binding Effect
The anticipated agreement for services contained in this Request for Proposal shall be binding
upon and inure to the benefit of the parties hereto and their respective heirs, executors,
administrators, legal representatives, successors and assigns.
10. Award of Contract
The award of the contract, if it be awarded, will be made to the most qualified Firm(s). Services
under the anticipated contract will be performed on an "as needed" basis, the City does not
guarantee the use of the anticipated contract during the contract term. The award of the
Page 7 of 10

anticipated contract will not be determined solely on price, but as a review of the proposed
Firm in its entirety. The City will notify the Firm(s) after proposal receipt what information, if
any, is required. The City reserves the right to reject any or all proposals and to waive any
irregularities therein. The successful Firm will be notified by letter mailed to the address shown
on the proposal response that their proposal has been accepted and that they have been awarded
the Contract.
11. Agreement and Term
It is the intent of the City to enter into a single or multiple agreement(s) with selected Firm(s).
The selected Firm(s) will enter into written contract(s) (the "Agreement") with the City of
Kirkwood with the terms and conditions set forth herein and provide service at the rates
submitted in the accepted Proposal Response. The resulting contract(s) will be subject to
termination by the City in the event of sale or destruction of the facilities or misfeasance,
nonfeasance or malfeasance of the Firm.
12. Termination of Contract by Convenience
The City or Firm may terminate the anticipated contract at any time during its term by giving
60-day written notice of such intention to terminate this contract and setting forth a specific
termination date.
13. Laws to be Observed
The successful Firm shall have a valid business license, hold all applicable certifications, and
agree to maintain them throughout the terms of the anticipated agreement. Firm shall at all
times observe and comply with all Federal and State laws, all local laws, ordinances, and
regulations existing at the time of or enacted subsequent to the execution of the contract which,
if in any manner, affect the prosecution of the contract. Firm shall indemnity and save harmless
the City and all of its representatives, and employees against any claim or liability arising from
or based on the violation of any such law, ordinance, regulation, order, or decree, whether by
himself, his employees, or his subcontractors.
14. Insurance Requirements
Indicate your ability to provide general and automotive liability insurance at rates per State of
Missouri statutory requirements.
15. E-Verify
Indicate your ability to provide a signed e-verify affidavit of compliance of Missouri Revised
Statute section 285.530.1 in that is shall not knowingly employ, hire for employment, or
continue to employ an unauthorized alien to perform work within the State of Missouri.
Page 8 of 10

16. Payment Terms
All requests for payment shall be submitted to the Purchasing Department located at 212 South
Taylor Avenue, Kirkwood, MO 63122. Billing submitted shall only include approved costs;
any additions that have not been approved by the City shall be excluded for payment. Payment
on billing will be issued within thirty (30) days following receipt of complete documentation
as is required for the project in question.
17. Invoicing
All contracted work completed must include the following information on the related invoice
for payment.
a) Contract or Purchase Order Number
b) Date of invoice
c) Invoice number
d) Description of Service(s)
e) Payment amount requested
18. Questions and Clarifications
All questions shall be submitted in writing via email to Rachel Shelley, Assistant Director of
Procurement, at shellers@kirkwoodmo.org.
19. Amendment Issuance
If Firm has any questions which arise concerning the true meaning or intent of the
specifications or any other requirements stated herein, Firm shall request that an
interpretation be made in an Addendum. Failure to request an Addendum governing any
such question shall not relieve Firm from delivery in accordance with the intent of the
specifications. If it becomes evident that the material contained within this Request for
Proposal requires amendment, the Director of Procurement shall issue a formal written
amendment to these documents for distribution to all known prospective respondents. The
issuance of an amendment may be released until the stated date and time of proposal
receipt. If it is deemed necessary by the City, the amendment may extend the current
proposal receipt deadline.
20. Proposal Acceptance
a) The City of Kirkwood reserves the right to accept proposals in whole or in part, and
to reject any and all proposals, and to negotiate separately as necessary to serve the
best interests of the City.
b) Notifications of award will be made by the Director of Procurement following
passage of a resolution by the council accepting the proposal.
Page 9 of 10

c) The proposal must remain valid for at least ninety (90) days after submittal date.
d) It is the intent of the City of Kirkwood to contract for this service as soon as
possible.
Page 10 of 10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Brand Name National Stock Numbers: Industry Feedback Request Active Contract Opportunity Notice

GENERAL SERVICES ADMINISTRATION

Bid Due: 2/12/2027

WTP Pipe Gallery Replacement - St. Charles County, MO 25-004 StatusAccepting Bids Prebid

Drexel Technologies

Bid Due: 11/18/2026

Western Transmission Main Phase 4C 22-008 StatusAccepting Bids Prebid Date 10/20/26 10:00am Bid

Drexel Technologies

Bid Due: 11/19/2026

Western Transmission Main Phase 4C 22-008 StatusAccepting Bids Prebid Date 10/20/26 10:00am Bid

Drexel Technologies

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.