| Location: | Arizona |
|---|---|
| Posted: | Aug 6, 2026 |
| Due: | Sep 7, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 127EAX26Q0087 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service.
Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape.
The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future.
The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.
| Sep 1, 2026 | [Combined Synopsis/Solicitation (Updated)] TBRD Water Leak Repair |

With GovernmentContracts, you can:
Project ID: 270146 Title: Silverbell Road Roadway Improvements - El Camino del Cerro
City of Tucson
Bid Due: 9/21/2026
Project ID: WS90320008 & WS85090005 Title: NORTH GATEWAY WATER RECLAMATION PLANT 2-STEP CONSTRUCTION
City of Phoenix
Bid Due: 9/18/2026
PR1349/PR1350 Notice of A-E RFQ for CM@R Project Department: Development Services, Public Works
Town of Gilbert
Bid Due: 10/06/2026
Project ID: Title: Citywide Water Main Replacement Phase 2 Addenda: 0 Release Date:
City of Prescott
Bid Due: 10/01/2026