| Location: | Virginia |
|---|---|
| Posted: | Apr 16, 2025 |
| Due: | May 15, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 92957 |
| Publication URL: | To access bid details, please log in. |
City of Lynchburg -Lynchburg, VA; Any and all Addenda will only be posted to the City's website. Please visit the City's website for copies of the Project Drawings
Closing On: 5/15/25 4:00 PM
Time Left: 28 days
E.C. Glass High School: The following scope of work is intended to address the building enclosure construction deficiencies and water intrusion located within E. C. Glass High School building. These issues were documented during visual observation, field testing, and destructive and non-destructive testing to ascertain the reported leaks within the building performed by Salas OâBrien design team. The investigation revealed several deficiencies with various building enclosure components and systems. The building enclosure construction generally consists of window assembly, masonry CMU units, stucco, TPO roofing assembly, and various transition/details. Based on the recommendations documented within the investigation report, the scope of work proposed to be performed for this project is included in the construction documents. R.S. Payne Elementary School: The following scope of work is intended to address the building enclosure construction deficiencies and water intrusion located within R. S. Payne Elementary School building. Theseissues were documented during visual observation, field testing, and destructive and nondestructive testing to ascertain the reported leaks within the building performed by Salas OâBrien design team. The investigation revealed several deficiencies with various building enclosure components and systems. The building enclosure construction generally consists of window assembly, masonry CMU units, stucco, TPO roofing assembly, and various transition/details. Based on the recommendations documented within the investigation report, the scope of work proposed to be performed for this project is included in the construction documents.
IFB Construction
View Opportunity
Add to Favorites
With GovernmentContracts, you can:
...Security System (ESS), Intrusion Detection System (IDS), access-control, credential-verification...
DEPT OF DEFENSE
Bid Due: 6/23/2026
..., building information systems, fire protection and alarm systems, intrusion detection system (IDS...
DEPT OF DEFENSE
Bid Due: 6/11/2026