CONSTRUCTION CONTRACTOR’S QUALIFICATION STATEMENTS
(PREQUALIFICATION PACKAGE)
NOTICE INVITING STATEMENTS OF QUALIFICATION
Statements of qualification may be submitted electronically (via email) to:
Lindsay Tucker (Litucker@GarverUSA.com)
until 2:00 P.M. on Friday, September 5, 2025,
at which time no more will be accepted for:
Stickney Water Treatment Plant (WTP) Structural Rehabilitation
Prospective Bidders may obtain the prequalification documents on the Board of Water and Sewer
Commissioners of the City of Mobile’s website (www.mawss.com/bids/project-bids-announcements/ )
or from the Garver Online Planroom
(Click the Planroom link @ www.garverusa.com)
The project is to conduct various repairs and updates to Stickney WTP. The completed work will provide
Owner with various structural repairs to noted issues on existing basin concrete walls, walkways, and other
surfaces. More specifically, the Project includes:
• Rehabilitation of concrete as outlined in the plans and specifications for flocculation Basins 1, 2, 3
and 4. This work includes but is not limited to surface preparation, crack injection and sealing,
forming, and resurfacing.
• Rehabilitation of the concrete as outlined in the plans and specifications for settling Basins 1, 2, 3
and 4.
• Rehabilitation of the concrete as outlined in the plans and specifications on the flume and
underdrain for Basins 1 and 2.
• Addition of covers over the back flume serving Basins 1 and 2.
• Repair of concrete staircase structure on west side of Basin 3.
• Repair of existing handrail mounting brackets
• Installation of new handrail.
Prospective Contractors should be aware that this project is funded via ADEM DWSRF.
For further information, contact Lindsay Tucker, Garver Project Manager, at
Litucker@GarverUSA.com.
Project No. W10-2401555
1
Stickney WTP Structural Rehabilitation
MAWSS
Contractor’s Prequalification Package
CONTRACTOR
PREQUALIFICATION PACKAGE
Project No. W10-2401555
2
Stickney WTP Structural Rehabilitation
MAWSS
Contractor’s Prequalification Package
Project No. W10-2401555
3
Stickney WTP Structural Rehabilitation
MAWSS
Contractor’s Prequalification Package
Contractor Prequalification Package
Contents
Schematic of Bid Period Procedure ..................................................................................................
4
Instructions for Contractors ................................................................................................................
5
Project Overview ................................................................................................................................
8
Prequalification Questionnaire ...........................................................................................................
9
License ............................................................................................................................................... 10
Current Projects ................................................................................................................................. 10
Construction Experience .................................................................................................................... 10
Personnel Experience/Management Plans ........................................................................................ 10
History of Change Orders .................................................................................................................. 11
Minimum Insurance Requirements .................................................................................................... 11
Financial Conditions ........................................................................................................................... 13
Additional Organization Background Information .............................................................................. 13
Grading System ................................................................................................................................. 14
Supplement 1 — General Contractor License Information ................................................................ 15
Supplement 2 — Current Project Information .................................................................................... 16
Supplement 3 — Relevant Construction Experience......................................................................... 17
Supplement 4 — Proposed Project Personnel .................................................................................. 18
Supplement 5 — Change Order History ............................................................................................ 21
Supplement 6 — Insurance Information ............................................................................................ 22
Supplement 7 — Financial Information .............................................................................................. 23
Supplement 8 — Additional Background Information ........................................................................ 25
Project No. W10-2401555
4
Stickney WTP Structural Rehabilitation
MAWSS
Contractor’s Prequalification Package
SCHEMATIC OF BID PERIOD PROCEDURES
Project: W10-2401555 Stickney WTP Structural Rehabilitation
1) Advertisement/Request for Qualifications
2) Review/Assess Contractor Submittals
3) Notify Contractors of Prequalification Status
4) Bid Period – Release of Contract Documents
1)
5) Mandatory Pre-Bid Meeting
6) Preparation/Issuance of Addendum(s)
7)
87)) Receive/Open Bids
8) Bid Evaluation/Recommendation to Award
9) Owner Authorization to Award
10) Issue Notice of Award
11) Execute Contracts and Issue Notice to Proceed
Project No. W10-2401555
5
Stickney WTP Structural Rehabilitation
MAWSS
Contractor’s Prequalification Package
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.