December 24th, 2025
RE: Request for Expression of Interest: First Capitol & Kingshighway Roundabout (CMAQ-
7302(721)), First Capitol Shared Use Path Bridge (TAP-7302(722)), & First Capitol
Improvements (West Clay to Kingshighway).
Dear Consultant:
The City of Saint Charles has an interest in securing professional services for work associated with
the following projects:
First Capitol & Kingshighway Roundabout (CMAQ-7302(721))
The project improvements include a new roundabout at First Capitol Drive and Kingshighway Street
to replace the existing signalized intersection. Median refuge islands will be installed on each leg of
the roundabout. The existing pavement at this intersection is in fair condition and will be replaced
with full depth concrete pavement as needed to construct the new roundabout.
The project also includes a new 10' wide shared use path (SUP) along the west side of First Capitol
Drive connecting to new SUP to be constructed between Kingshighway and Fifth Street (previously
awarded STP funds).
First Capitol Shared Use Path Bridge (TAP-7302(722))
The project will construct a 90 foot span SUP bridge over First Capitol Drive connecting the
Lindenwood University library to public sidewalks along the south side of First Capitol. All
improvements shall meet ADA.
First Capitol Improvements (West Clay to Kingshighway) (Design Non-Participating)
The project improvements include a new roundabout at First Capitol Drive and Tompkins Street to
replace the existing signalized intersection. Median refuge islands will be installed on each leg of
the roundabout. The existing pavement at this intersection is in fair condition and will be replaced
with full depth concrete pavement as needed to construct the new roundabout. Remaining
pavement will be replaced or mill/filled as needed.
The project also includes a new 10' wide shared use path (SUP) along the north/west side of First
Capitol Drive continuing up West Clay Street to connect to existing SUP. Existing center median will
be replaced with concrete barrier. Advanced detection will be installed at the West Clay signal.
Tentative Project Schedules:
Design NTP – April 2026
Final PS&E – April 2028
Bid Opening – August 2028
Construction Completed – May 2030
Estimated cost of First Capitol Roundabout: $3,700,000.00
Estimated cost of First Capitol SUP: $2,500,000.00
Estimated cost of First Capitol West Clay to Kingshighway: $7,800,000
The estimated total cost of these projects is $14,000,000.00.
To be considered for this project your written response (mail or email, 2 written pages max.) must
be received by no later than 2 p.m. on January 23rd, 2026. In your letter, please describe why you
are interested in the project and why you feel that you are most qualified to complete the proposed
project. After all responses are received, City Staff will select the 3 most qualified firms based on
scoring of your prequalification packet and your response letter.
The prequalification scoring will be based on the following criteria:
• Experience in work required
• Record of the firm accomplishing the work on other projects in the required time
• QA/QC Program
• Recent experience showing the accuracy of construction project cost estimates
• Project Management Philosophy and Approach
The selected 3 firms will then be requested to submit a qualifications-based Request for Proposal
(RFP) on the project. These proposals will be ranked, and the project will then be negotiated with
the highest-rated firm.
Additional information relating to the proposed project scope will be distributed during the RFP
stage of this project solicitation, including the Project Charter. Staff will not address project-specific
questions during the expression of interest solicitation but will during the RFP stage.
It is the responsibility of the consultant to ensure their pre-qualification packet is up-to-date.
Updates or supplements to the prequalification packet that are to be considered in the current
scoring will be accepted up to one week prior to the EOI submittal deadline. For information
regarding the prequalification and consultant selection process, please refer to
https://epg.modot.org/index.php/LPA:136.4_Consultant_Selection_and_Consultant_Contract_Mana
gement#136.4.1.5_Consultant_Qualification
It is required that your firm’s Statement of Qualification (RSMo 8.285 through 8.291) be submitted
with your firm’s Letter of Interest, or be on file with the City of St. Charles. The statement of
qualification is not included in the total page count limit.
DBE firms must be listed in the MRCC DBE Directory located on MoDOT’s website at
www.modot.gov, in order to be counted as participation towards an established DBE Goal. We
encourage DBE firms to submit letters of interest as prime consultants for any project they feel can
be managed by their firm.
The DBE PE Goal for this project is: 0%
It is required that your firm be prequalified with MoDOT and listed in MoDOT’s Approved Consultant
Prequalification List, or your firm will be considered non-responsive.
If your firm would like to be considered for this project, please submit a written Expression of
Interest or email to the following contact:
Jonathan Swagman, PE
Project Manager
City of Saint Charles
200 North Second Street, Room 203
St. Charles, MO 63301
jonathan.swagman@stcharlescitymo.gov
We thank you for your interest in working with the City of Saint Charles.
Sincerely,
Jonathan Swagman, PE
Project Manager
Cc: Dan Mann, P.E., City Engineer
Nick Galla, P.E., Assistant City Engineer – Design
City/County: St. Charles City/St. Charles County, Route: First Capitol Drive
Federal Aid No: CMAQ-7302(721); TAP-7302(722)
1. First Capitol & Kingshighway Roundabout. (CMAQ-7302(721))
Location:
2. First Capitol Shared Use Path Bridge (TAP-7302(722))
3. First Capitol West Clay to Kingshighway
Proposed
Improvement:
1. New roundabout and full depth pavement, new shared use path
2. New SUP connections across First Capitol Drive with a prefabricated steel
bridge
3. New roundabout with full depth pavement, pavement rehabilitation, new
shared use path, median barrier, advanced detection
Length:
Approximate
Construction
Cost:
DBE Goal
Determination:
Consultant
Services
Required:
First Capitol Roundabout - .2 miles
First Capitol SUP Bridge. - .1 miles
First Capitol West Clay to Kingshighway - .5 miles
First Capitol Roundabout - $3,230,000.00
First Capitol SUP Bridge - $2,230,000.00
First Capitol West Clay to Kingshighway - $5,420,000.00
0%
The engineering responsibilities may include but are not limited to the following:
The preparation of Conceptual plans, Preliminary plans, Contract plans. Design
services may include, right of way plans, surveying, subsurface utility investigation,
title research, geotechnical investigations, roadway plans, retaining wall plans,
striping plans, public involvement, environmental and historic preservation
services/permits, archeological surveys, contract documents, assisting with the
bidding process, construction support/construction inspection, utility
coordination/permits and traffic control plans including the preparation of PS&E and
final documents, project administration and management.
Other
Comments:
Contact:
Deadline:
Jonathan Swagman, P.E.
Project Manager
City of St. Charles
200 North Second Street, Room 203
St. Charles, MO 63301
Phone: 636-949-3241
Email: jonathan.swagman@stcharlescitymo.gov
2:00 pm, January 23rd, 2026
Submit:
•Letter of interest should not exceed 2 pages total. A page is defined as 8-1/2 by 11 inches and printed
on one side. 3 copies of the letter interest should be received at the address and by the time specified.
•Statement of Qualifications
•Affidavit of Compliance with the federal work authorization program
•E-Verify Memorandum of Understanding
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.