| Location: | California |
|---|---|
| Posted: | Jul 10, 2026 |
| Due: | Aug 10, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
SJCDPW-RFP-26-08
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-08. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Design Engineering for the State Route (SR) 26 and Jack Tone Road Roundabout Project (PROJECT).
The selected CONSULTANT will be the highest-ranking CONSULTANT that has successfully negotiated the terms for award of a consultant services agreement. The selected CONSULTANT will be requested to enter into a consultant services agreement with San Joaquin County. The CONSULTANT shall prepare project documentation, plans, specifications and estimates consistent with SJCDPW Standards and Caltrans Guidance documents including but not limited to; Project Development Procedures Manual, Plans Preparation Manual, California Manual on Uniform Traffic Control Devices, Construction Contract Development Guide, and Right of Way Manual. SJCDPW’s goal, for scheduling purposes, is to have the Project Study Report – Project Development Support or other agreed upon alternative Project Initiation Document within twelve (12) months or less from issuance of the Notice to Proceed (NTP). Submission of the sixty-five percent (65%) design completed for the PROJECT within twenty-four (24) months or less from issuance of the NTP. Within this time, the necessary survey data will be collected and analyzed, and the roadway geometry/topography will be identified. Submission of the ninety-five percent (95%) design shall be due on or before thirty (30) months from issuance of the NTP. Right-of-Way activities shall be completed within forty-two (42) months from issuance of the NTP. Submission of the Final signed PS&E shall be due on or before forty-eight (48) months from issuance of the NTP. The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Monday, August 10, 2026. A copy of SJCDPW-RFP-26-08 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs and https://www.bidexpress.com . All prospective consultants must register for solicitation No. SJCDPW-RFP-26-08 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. For general questions regarding the solicitation, please contact Mr. Nhan Tran, Management Analyst II at email: ntran@sjgov.org . |
08/10/2026 11:00 PM UTC |

With GovernmentContracts, you can:
..., and Construction (EPC) procurement, detailed design review, creating specifications, procurement... oversight, construction, ...
City of Lodi
Bid Due: 10/23/2026
..., California 95060 Category Information UNSPSC 72152601 Special trade construction & maint srvcs... ...
State Government of California
Bid Due: 10/02/2026
...(Including Telex and Watts Services) NIGP 92544 General Construction: Management, Scheduling, Cost...: CONSTRUCTION, ...
San Diego County Water Authority
Bid Due: 9/29/2026
..., Scheduling, Cost Estimation - Engineering NIGP 91200 CONSTRUCTION SERVICES, GENERAL NIGP 80100 ...
San Diego County Water Authority
Bid Due: 9/30/2026