F115--Sources Sought Notice Spill Prevention Control and Countermeasures Plan (SPCCP) 5-year review Marion, IL VA Medical Center
| Location: |
Illinois |
| Posted: |
Nov 3, 2025 |
| Due: |
Nov 7, 2025 |
| Agency: |
VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- F - Natural Resources and Conservation Services
|
| Solicitation No: |
36C25526Q0066 |
| Publication URL: |
To access bid details, please log in. |
F115--Sources Sought Notice Spill Prevention Control and Countermeasures Plan (SPCCP) 5-year review Marion, IL VA Medical Center
Active
Contract Opportunity
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
255-NETWORK CONTRACT OFFICE 15 (36C255)
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Sources Sought (Original)
-
Original Published Date: Nov 03, 2025 01:44 pm CST
-
Original Response Date: Nov 07, 2025 11:00 am CST
-
Inactive Policy: Manual
-
Original Inactive Date:
Dec 07, 2025
-
Initiative:
Classification
Description
Revise Spill Prevention, Control, and Countermeasures Plan (SPCCP)
For Marion, IL VA Medical Center (MRN)
INTRODUCTION
MRN VAMC is seeking a 5-year review and amendment of the current plan to verify compliance with current and any new requirements listed in (a-d) below and to update since the approval of the current SPCCP dated/signed March 30, 2021. The revised document shall be electronic and user-friendly. The contractor shall perform a 5-year review according to 40 CFR 112, to include any revisions, updates, or technical changes for amendment. The contractor will make necessary changes including plan content, maps, worksheets, charts, cross references, etc. The contractor may use current plans as references for technical information.
SPECIFIC PROJECT REQUIREMENTS
The contractor shall: amend, update, and prepare the existing SPCCP, which must be fully compliant with the latest requirements of 40 CFR 112 as well as applicable State and Local regulations. An update of the emergency response plan should be included for accidental releases of vehicular and equipment petroleum products, coolants, and lubricants within the SPCCP. This will include coordination with and cross-referencing the medical center s current Emergency Operations Plan and Integrated Contingency Plan. The plan shall be certified by an Illinois registered Professional Engineer (P.E.) experienced in SPCCP preparation and current industry standards for oil storage and spill prevention.
40CFR 112.7, Oil Pollution Prevention.
Amend technical changes from design, construction, operation, and/or maintenance.
National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code.
All applicable federal, state and local regulations.
Provide updates for any new Reporting and Training requirements
Attachments/Links
Contact Information
Contracting Office Address
-
VA MEDICAL CENTER 4101 SOUTH 4TH STREET
-
LEAVENWORTH , KS 66048
-
USA
Secondary Point of Contact
History
-
Nov 03, 2025 01:44 pm CSTSources Sought (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.