| Location: | Florida |
|---|---|
| Posted: | Apr 27, 2026 |
| Due: | May 15, 2026 |
| Agency: | Keys Energy Services |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 09-26 |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| 4/22/2026 | 9:00 AM | Yes | A mandatory pre-construction meeting will be held April 22, 2026 at 9:00 a.m. at the Keys Energy Services, Board Room, 1001 James Street, Key West, FL 33040 followed by a visit to the site with the project engineers. Contractors are required to wear Fire Retardant Clothing, Hard Hats, and Steel Toe Shoes for site visit. Proposals received by Contractors not in attendance will be rejected. Please notify Tyler Randolph at Tyler.Randolph@keysenergy.com, if you plan on attending. |
| Date | Time | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
| There is a link on page 19 of the document to download additional files. We are not able to access it. There is an error stating that the link has been removed. Can we get access to these documents through vendor link? | 3/27/2026 7:14:46 AM | https://keysenergy0.sharepoint.com/:f:/s/Purchasing/IgAeftS3NPyITLzYdYRH8au6Aan23gj6Esdy6XoXXmLKBQk?e=fz1Vxb | 3/27/2026 1:35:25 PM |
| We would like to inquire if KEYS would be open to considering engineering-only bids for this project | 3/27/2026 1:37:11 PM | ||
| We would like to inquire if KEYS would be open to considering engineering-only bids for this project | 3/27/2026 1:56:58 PM | ||
|
If contractor feels barges are required, what permits are required and can Keys Energy help facilitate obtaining permits.
Has an engineering study been completed to verify structures are sound enough to hang working ladder, specifically H-frame structures. |
4/27/2026 8:06:58 AM | ||
| Can you provide reel lengths for static. | 4/27/2026 8:53:23 AM | ||
| Has the question deadline been moved out. | 4/27/2026 11:10:39 AM | KEYS will extend the question deadline until Friday, May 1, 2026 at noon. | 4/27/2026 11:40:52 AM |
| Code | Description |
| [961-83] | Utility Services, Electric |
| [925-78] | Power Generation, Transmission, Distribution - Engineering |
| [912-21] | Construction, Energy Related (All Types) |
| [917-76] | Maintenance and Repair, Transmission Service |
| [913-89] | Maintenance and Repair, Utility/Underground Projects |
| [913-41] | Construction, Power Line (Includes Installation, Maintenance, and Repair) |
| [912-30] | Construction, Power Plant |
| [725-42] | Poles, Metal, Transmission, High Voltage (EFFECTIVE 3-1-07 THIS CLASS-ITEM INACTIVATED FOR NEW USE, REFER TO 839-60) |
| [839-60] | Poles, High Voltage Transmission |
| [917-76] | Maintenance and Repair, Transmission Service |
| [925-78] | Power Generation, Transmission, Distribution - Engineering |
| [936-77] | Substation/High Voltage (Electrical) Maintenance and Repair |
| [906-68] | Power Generation, Transmission, Distribution - Architectural |
| [913-56] | Construction, Utility/Underground Projects |
| Publication | Date |
| The Key West Citizen | 3/28/2026 |
| The Key West Citizen | 4/4/2026 |

With GovernmentContracts, you can:
...transmission engineering 83101804 Electric power transmission services 83101904 Energy Utilities The... system construction ...
State Government of Florida
Bid Due: 6/06/2026
...Main Agency Keys Energy Services Status Active Fiscal Year 2026 Primary Contact Tyler ...
Brevard County School Board
Bid Due: 7/10/2026
...Main Agency Keys Energy Services Status Active Fiscal Year 2026 Primary Contact Tyler ...
Keys Energy Services
Bid Due: 7/10/2026
...Main Agency Keys Energy Services Status Active Fiscal Year 2026 Primary Contact Tyler ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/10/2026