| Location: | Massachusetts |
|---|---|
| Posted: | Apr 27, 2026 |
| Due: | May 25, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of full demolition of the superstructure and the substructure on the upstream side. The downstream side will consist of a partial substructure removal and replacement with a concrete bridge seat and concrete repairs to the abutment backface. These rehabilitated abutments will support precast concrete beams and cast-in-place closure beams on either end for a total length of 22’-0”. The upstream side will be replaced with a 42’-1” long precast concrete rigid frame structure containing an angle point to match the existing stream alignment. The training walls on the upstream side will be replaced using the existing stones to construct mortar rubble masonry walls supported on cast-in-place concrete footings. Additionally, the retaining wall underneath the building on the downstream side will be rehabilitated in a similar fashion to the abutment to remain. The out-to-out width of the proposed replacement structure will be 68’-10”, with a roadway width of 48’-9”.

With GovernmentContracts, you can:
...at the Department of Public Works Office Building located at 275 Old Lancaster ...
Commonwealth of Massachusetts
Bid Due: 10/08/2026
...Follow Demolition and Construction of Radio Tower at Mount Wachusett, Princeton, MA Active..., ...
DEPT OF DEFENSE
Bid Due: 10/13/2026
...Bid Detail27-033 - For Sale: Redevelop Residential Building at 321 Tiffany Street in ...
City of Springfield
Bid Due: 10/14/2026
...Bid Number: 261552 Bid Title: New Administration Building Lawrence Municipal Airport Construction... work ...
City of Lawrence
Bid Due: 10/08/2026