Circuit Street/Hanover Street Intersection Improvements
| Location: |
Massachusetts |
| Posted: |
May 12, 2025 |
| Due: |
May 30, 2025 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- S - Utilities and Training Services
|
| Solicitation No: |
BD-25-1278-DPW15-DPW1-116542 |
| Publication URL: |
To access bid details, please log in. |
Bid Solicitation: BD-25-1278-DPW15-DPW1-116542
|
|
Header Information
|
|
Bid Number:
|
BD-25-1278-DPW15-DPW1-116542
|
Description:
|
Circuit Street/Hanover Street Intersection Improvements
|
Bid Opening Date:
|
05/30/2025 10:00:00 AM
|
|
Purchaser:
|
Kurt Kelley
|
Organization:
|
Town of Hanover
|
|
Department:
|
DPW15 - Public Works
|
Location:
|
DPW1 - DPW Office
|
|
Fiscal Year:
|
25
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
05/12/2025
|
Available Date
:
|
05/12/2025 12:00:00 AM
|
|
Info Contact:
|
swerra@hshassoc.com
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
A mandatory pre-bid conference will be held on May 21st, 2025 at 10:30 AM local time. The meeting will be held at the
Hanover Department of Public Works Main Office at 495 Hanover Street (Sylvester School), Hanover, MA 02339.
|
|
Bulletin Desc:
|
This project includes infrastructure, sidewalk, and signal improvements at
the intersection of Hanover Street/Pleasant Street/Circuit Street in the Town of Hanover, Massachusetts. The
project consists of the construction of a 10-foot-wide shared use path on one side of Route 139, the addition of new
pedestrian signal heads, pedestrian pushbuttons, pedestrian curb ramps, crosswalk striping, and associated signal
timing changes at the intersection.
|
|
|
Ship-to Address:
|
Victor Diniak
40 Pond Street
Hanover, MA 02339
US
Email: vdiniak@hanoverdpw.org
Phone: (781) 826-3189
|
Bill-to Address:
|
Victor Diniak
40 Pond Street
Hanover, MA 02339
US
Email: vdiniak@hanoverdpw.org
Phone: (781) 826-3189
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
72-14
-
10
)
|
This project includes infrastructure, sidewalk, and signal improvements at
the intersection of Hanover Street/Pleasant Street/Circuit Street in the Town of Hanover, Massachusetts. The
project consists of the construction of a 10-foot-wide shared use path on one side of Route 139, the addition of new
pedestrian signal heads, pedestrian pushbuttons, pedestrian curb ramps, crosswalk striping, and associated signal
timing changes at the intersection.
|
|
U N S P S C Code:
|
72-14-10
Highway and road construction services
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...CAFETERIA DESIGN & IMPROVEMENTS at BEVERLY HIGH SCHOOL Bid No. 26-015 The redesign, ...
City of Beverly
Bid Due: 6/25/2026
...capacity to successfully support school, district, and state sustainable improvement efforts. This MA... ...
Commonwealth of Massachusetts
Bid Due: 12/29/2028
...for improvements to the existing softball fields at the Holliston High School located ...
Holliston town
Bid Due: 6/22/2026
...and Sea Street, Main Street and High School Road, and Main Street and ...
Town of Barnstable
Bid Due: 6/25/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.